Home > NRC Library > ADAMS Public Documents
Web Package for FOIA/PA Cases/2016-0071
Accession Number: ML16123A037
Date Released: Monday, May 2, 2016
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML15142A506 - Oconee Nuclear Station, Units 1, 2 and 3 - Emergency Plan Implementing Procedures Manual Volume 1, Revision 2015-003. (41 page(s), 5/20/2015)
- ML14261A186 - Oconee Nuclear Station, Units 1, 2, and 3 - Emergency Plan Implementing Procedure Revision 2014-021. (184 page(s), 9/11/2014)
- ML13323A764 - Oconee Nuclear Station, Units 1, 2, and 3 - Emergency Plan, Volume A, Revision 2013-01. (192 page(s), 11/14/2013)
- ML15005A072 - Oconee Nuclear Station, Units 1, 2, and 3 - Submittal of Emergency Plan Implementing Procedure Revision 2014-026. (61 page(s), 12/30/2014)
- ML14037A080 - Oconee Nuclear Station, Units 1, 2 and 3, Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-01. (38 page(s), 2/4/2014)
- ML14120A362 - Oconee Nuclear Station, Units 1, 2, and 3 - Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-010. (41 page(s), 4/28/2014)
- ML15176A261 - Oconee, Units 1, 2, and 3 - Emergency Plan Implementing Procedures Manual, Volume 1, Revision 2015-004. (385 page(s), 6/22/2015)
- ML14120A361 - Oconee Nuclear Station, Units 1, 2, and 3 - Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-011. (58 page(s), 4/28/2014)
- ML13144A584 - Oconee, Units 1, 2, and 3 - Emergency Plan Implementing Procedures Manual - Volume C, Revision 2013-06. (50 page(s), 5/20/2013)
- ML14309A697 - Oconee Nuclear Station, Units 1, 2, and 3 - Emergency Plan Implementing Procedure Revision 2014-023. (138 page(s), 10/30/2014)
- ML14143A185 - Oconee Nuclear Station, Units 1, 2, and 3 - Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-014. (45 page(s), 5/22/2014)
- ML15022A215 - Oconee, Units 1, 2, and 3 - Emergency Plan Revision 2014-003. (270 page(s), 1/19/2015)
- ML15009A043 - Oconee Nuclear Station, Units 1, 2, and 3, Emergency Plan Implementing Procedure, Revision 2014-027. (47 page(s), 1/5/2015)
- ML14321A073 - Oconee Nuclear Station, Units 1, 2 and 3 - Emergency Plan Implementing Procedure Revision 2014-024. (61 page(s), 11/10/2014)
- ML16118A158 - FOIA/PA-2016-0071 - Resp 4 - Final. (4 page(s), 2/19/2016)
- ML14322A748 - Oconee Nuclear Station, Units 1, 2 and 3 - Emergency Plan Implementing Procedure Revision 2014-024. (61 page(s), 11/10/2014)
- ML13121A461 - Oconee Nuclear Station, Units 1, 2, and 3 - Emergency Plan Implementing Procedures Manual Volume C, Revision 2013-05. (104 page(s), 4/30/2013)
- ML15072A106 - Oconee, Units 1, 2 and 3 - Submittal of Revised Flood Hazard Reevaluation Report per NRC's Request for Additional Information. (4 page(s), 3/6/2015)
- ML13351A317 - Oconee Nuclear Station, Units 1, 2, and 3-Safety Evaluation Input Regarding Temporary Technical Specification Change Request to Extend the Completion Time for an Inoperable Keowee Hydro Unit(TAC ME9021, ME9022, ME9023). (14 page(s), 12/24/2013)
- ML13046A398 - Oconee, Units 1, 2, and 3, Emergency Plan Implementing Procedures Manual, Volume C, Revision 2013-02. (234 page(s), 2/12/2013)
- ML13063A065 - Oconee, Units 1, 2, and 3, Submittal of Overall Integrated Plan, in accordance with the March 12, 2012, Commission Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events, EA-12-049. (61 page(s), 2/28/2013)
- ML13256A372 - (Redacted) Letter from L Criscione to Chairman A Macfarlane. (21 page(s), 9/18/2012)
- ML14037A081 - Oconee Nuclear Station, Units 1, 2 and 3, Emergency Plan Implementing Procedures Manual, Volume C, Revision 2014-003. (106 page(s), 2/4/2014)
- ML14324A700 - Oconee Trip Report. (1 page(s), 11/20/2014)
- ML14087A100 - Oconee Nuclear Station, Units 1, 2 and 3 - Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-007. (36 page(s), 3/25/2014)
- ML14051A631 - Oconee Nuclear Station, Units 1, 2 and 3 - Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-002. (86 page(s), 2/12/2014)
- ML13338A177 - Oconee Nuclear Station, Units 1, 2 and 3 - Emergency Plan Implementing Procedures Manual, Volume C, Revision 2013-14. (56 page(s), 12/2/2013)
- ML14164A131 - Oconee Nuclear Station, Units 1, 2, and 3, Assessment of Supporting Documentation Related to the Flooding Hazard Reevaluation Report. (2 page(s), 6/13/2014)
- ML15071A023 - Oconee, Units 1, 2, and 3 - Emergency Plan Implementing Procedures Manual, Volume 1, Revision 2015-002. (43 page(s), 3/5/2015)
- ML12352A125 - Oconee Nuclear Station, Units 1, 2 and 3, Submittal of Emergency Plan, Volume A, Revision 2012-04. (46 page(s), 12/13/2012)
- ML15306A020 - FOIA/PA-2016-0071-r - All non-publicly available agency records generated since September 18, 2012, pertaining to document numbers 05000269, 05000270 or 05000287, and containing the word "Jocassee". (7 page(s), 10/31/2015)
- ML13303A452 - Oconee Nuclear Station, Units 1, 2, and 3 - Emergency Plan Implementing Procedures Manual Volume C, Revision 2013-10. (45 page(s), 10/22/2013)
- ML14143A251 - Oconee Nuclear Station, Units 1, 2 and 3 - Emergency Plan Implementing Procedures Manual Volume A, Revision 2014-001. (230 page(s), 5/22/2014)
- ML15142A507 - Oconee Nuclear Station, Units 1, 2 and 3 - Emergency Plan Revision 2015-003. (122 page(s), 5/20/2015)
- ML13105A009 - Oconee Nuclear Station, Units 1, 2 and 3, Submittal of Emergency Plan Implementing Procedures Manual, Volume C, Revision 2013-04. (180 page(s), 4/8/2013)
- ML15183A011 - Oconee Nuclear Station, Units 1, 2, and 3 - Submittal of Emergency Plan Revision 2015-004. (239 page(s), 6/25/2015)
- ML16055A187 - FOIA/PA-2016-0071 - Resp 3 - Interim, Continuing to Process Request. Part 1 of 2. (238 page(s), 1/15/2016)
- ML16014A035 - FOIA/PA-2016-0071 - Resp 2 - Interim. Records Being Released in Part. Part 1 of 3. (851 page(s), 1/5/2016)
- ML16055A188 - FOIA/PA-2016-0071 - Resp 3 - Interim, Continuing to Process Request. Part 2 of 2. (115 page(s), 1/15/2016)
- ML16014A037 - FOIA/PA-2016-0071 - Resp 2 - Interim. Records Being Released in Part. Part 2 of 3. (532 page(s), 1/5/2016)
- ML16014A038 - FOIA/PA-2016-0071 - Resp 2 - Interim. Records Being Released in Part. Part 3 of 3. (596 page(s), 1/5/2016)
- ML16055A185 - FOIA/PA-2016-0071 - Resp 3 - Interim. (3 page(s), 1/15/2016)
- ML16014A034 - FOIA/PA-2016-0071 - Resp 2 - Interim. (5 page(s), 1/5/2016)
- ML15166A417 - Catawba, Units 1 and 2, McGuire, Units 1 and 2 and Oconee 1, 2 and 3 - Transmits Emergency Plan Implementing Procedures. (255 page(s), 6/15/2015)
- ML15113A801 - Duke Energy Carolina LLC submits EPIPs, Rev 5 to SR/0/A/2000/003, "Activation of the Emergency Operations Facility" and Rev 4 to SR/0/A/2000/004, "Notification to States and Counties from the Emergency Operations Facility for Catawba, McGuire and Oconee. (162 page(s), 4/23/2015)
- ML15349A473 - FOIA/PA-2016-0071 - Resp 1 - Interim. (1 page(s), 12/14/2015)
- ML15232A495 - Catawba, McGuire, and Oconee - Transmittal of Emergency Plan Implementing Procedure, Revision 7 to SR/0/A/2000/003, Activation of the Emergency Operations Facility. (119 page(s), 8/20/2015)
- ML15349A471 - FOIA/PA-2016-0071 - Resp 1 - Interim, Records Now Being Released in Their Entirety or in Part. (164 page(s), 12/14/2015)