Diablo Canyon, Units 1 and 2 - Submittal of Tricon Phase 2 Documents for the License Amendment Request for Process Protection System Replacement.
Accession Number: ML16061A481
Date Released: Wednesday, March 9, 2016
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML16061A452 - Diablo Canyon, Units 1 and 2 - Submittal of Tricon Phase 2 Documents for the License Amendment Request for Process Protection System Replacement. (13 page(s), 2/11/2016)
- ML16061A460 - Diablo Canyon, Units 1 and 2 - Revision 9 to 993754-1-915-NP, Safety Analysis. (116 page(s), 12/9/2014)
- ML16061A461 - Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-11-818-NP, Protection Set I, System Time Response Confirmation Report. (26 page(s), 7/1/2014)
- ML16061A463 - Diablo Canyon, Units 1 and 2 - Revision 1 to 993754-11-854-0-NP, Protection Set I, Hardware Validation Test Report. (9 page(s), 8/7/2014)
- ML16061A459 - Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report. (43 page(s), 1/14/2016)
- ML16061A464 - Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report PPSI. (44 page(s), 1/15/2016)
- ML16061A465 - Diablo Canyon, Units 1 and 2 - Revision 1 to 993754-11-862-NP, V&V Implementation Phase Summary Report PPSI. (55 page(s), 8/7/2014)
- ML16061A466 - Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-818-NP, Protection Set II, System Time Response Confirmation Report. (16 page(s), 12/1/2014)
- ML16061A470 - Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-0-NP, Protection Set II, Hardware Validation Test Report. (7 page(s), 9/12/2014)
- ML16061A471 - Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-1-NP, Protection Set II, Factory Acceptance Report. (24 page(s), 12/12/2014)
- ML16061A467 - Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-861-NP, V&V Design Phase Summary Report PPSII-IV. (29 page(s), 8/28/2014)
- ML16061A468 - Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV. (31 page(s), 1/15/2016)
- ML16061A469 - Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-818-NP, Protection Set II, System Time Response Confirmation Report. (17 page(s), 12/1/2014)
- ML16061A476 - Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-854-0-NP, Protection Set III, Hardware Validation Test Report. (8 page(s), 9/12/2014)
- ML16061A477 - Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-854-1-NP, Protection Set III, Factory Acceptance Test Report. (24 page(s), 12/12/2014)
- ML16061A473 - Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-818-NP, Protection Set IV, System Time Response Confirmation Report. (16 page(s), 12/1/2014)
- ML16061A474 - Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-0-NP, Protection Set IV, Hardware Validation Test Report. (8 page(s), 9/12/2014)
- ML16061A475 - Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-1-NP, Protection Set IV, Factory Acceptance Test Report. (26 page(s), 12/12/2014)