Home > NRC Library > ADAMS Public Documents
ACRS Report to the Library of Congress (June-December 2015).
Accession Number: ML16004A318
Date Released: Wednesday, January 27, 2016
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML15187A380 - Summary Report - 625th Meeting of the Advisory Committee on Reactor Safeguards, June 10-12, 2015 (5 page(s), 7/7/2015)
- ML15173A281 - Grand Gulf Nuclear Station Maximum Extended Load Line Limit Analysis Plus (MELLLA+) License Amendment Request (7 page(s), 6/24/2015)
- ML15174A093 - PSEG Early Site Permit (3 page(s), 6/25/2015)
- ML15163A184 - Draft Regulatory Guide, DG-1323, "Comprehensive Vibration Assessment Program for Reactor Internals During Preoperational and Startup Testing" (2 page(s), 6/15/2015)
- ML15163A177 - Draft Final Regulatory Guides, RG 1.215, "Guidance for ITAAC Closure Under 10 CFR Part 52" and RG 5.84, "Fitness-for-Duty Programs at New Reactor Construction Sites" (2 page(s), 6/15/2015)
- ML15163A185 - Regulatory Information Summary, 2014-XX, "Applicability of ASME Code Case N-770-1 as Conditioned in 10 CFR 50.55a, 'Codes and Standards', to Branch Connection Butt Welds" (2 page(s), 6/15/2015)
- ML15203A128 - Summary Report - 626th Meeting of the Advisory Committee on Reactor Safeguards, July 8-10, 2015 (3 page(s), 7/23/2015)
- ML15201A467 - Nine Mile Point Nuclear Station Unit 2 Maximum Extended Load Line Limit Analysis Plus (MELLLA+) License Amendment Request (7 page(s), 7/21/2015)
- ML15194A137 - Draft Regulatory Guide, Withdrawal of RG 1.35, "Inservice Inspection of Ungrouted Tendons in Prestressed Concrete Containments" (4 page(s), 7/13/2015)
- ML15194A141 - Withdrawal of Regulatory Guide (RG) 1.35, "Inservice Inspection of Ungrouted Tendons in Prestressed Concrete Containments" (2 page(s), 7/13/2015)
- ML15278A060 - Summary Report - 627th Meeting of the ACRS, September 9-12, 2015 (4 page(s), 10/5/2015)
- ML15264A955 - Report on the Safety Aspects of the License Renewal Application for Byron Station Units 1 and 2 and Braidwood Station Units 1 And 2 (5 page(s), 9/21/2015)
- ML15265A139 - Draft Regulatory Basis for Containment Protection and Release Reduction for Mark I and Mark II Boiling Water Reactors (8 page(s), 9/22/2015)
- ML15266A352 - Interim Staff Guidance: DC/COL-ISG-028, "Assessing the Technical Adequacy of the Advanced Light-Water Reactor Probabilistic Risk Assessment for the Design Certification Application and Combined License Application" (5 page(s), 9/23/2015)
- ML15257A260 - Draft Regulatory Guide (DG) 8030, Revision 3, "Instructions for Recording and Reporting Occupational Radiation Dose Data" (1 page(s), 9/15/2015)
- ML15308A089 - Summary Report - 628th Meeting of the Advisory Committee on Reactor Safeguards, October 7-10, 2015 (5 page(s), 11/4/2015)
- ML15286A426 - Report on the Safety Aspects of the Construction Permit Application for SHINE Medical Technologies, Inc. Medical Isotope Production Facility (5 page(s), 10/15/2015)
- ML15289A144 - Reactor Oversight Process Enhancements. (6 page(s), 10/16/2015)
- ML15293A314 - Interim Staff Guidance, "Guidance for the Evaluation of Acute Chemical Exposures and Proposed Quantitative Standards" (4 page(s), 10/20/2015)
- ML15286A269 - Draft Regulatory Guide 1.212, Revision 1, Sizing of Large Lead-Acid Batteries (2 page(s), 10/13/2015)
- ML15286A296 - Documentation of Receipt of Applicable Official NRC Notices to the Advisory Committee on Reactor Safeguards for October, 2015. (5 page(s), 10/9/2015)
- ML15332A002 - Summary Report - 629th Meeting of the Advisory Committee on Reactor Safeguards, November 4-7, 2015. (5 page(s), 12/1/2015)
- ML15317A142 - Draft SECY Paper, Recommendations on Issues Related to Implementation of a Risk Management Regulatory Framework (5 page(s), 11/13/2015)
- ML15316A125 - Report on the Safety Aspects of the License Renewal Application for Davis-Besse Nuclear Power Station (8 page(s), 11/12/2015)
- ML15320A074 - Plans for Resolving the NRC Near-Term Task Force Open Fukushima Tier 2 and 3 Recommendations. (11 page(s), 11/16/2015)
- ML15316A490 - The Revised Fuel Cycle Oversight Process Cornerstones (4 page(s), 11/17/2015)
- ML15287A332 - ACRS Assessment of the Quality of Selected NRC Research Projects-FY 2015 (17 page(s), 11/17/2015)
- ML15313A367 - Draft Regulatory Guide. (2 page(s), 11/9/2015)
- ML15351A206 - Summary Report - 630th Meeting of the Advisory Committee on Reactor Safeguards, December 3-5, 2015 (3 page(s), 12/17/2015)
- ML15348A196 - Report on the Safety Aspects of the Duke Energy Carolinas, LLC, Combined License Application for William States Lee III Nuclear Station, Units 1 and 2 (5 page(s), 12/14/2015)
- ML15343A372 - Documentation of Receipt of Applicable Official NRC Notices to the Advisory Committee on Reactor Safeguards for December, 2015. (4 page(s), 12/9/2015)
- ML15343A375 - Draft Regulatory Guides, SG-1292, "Dedication of Commercial-Grade Items for Use in Nuclear Power Plants" and DG-1324, "Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors" (2 page(s), 12/4/2015)