Home > NRC Library > ADAMS Public Documents
FOIA/PA-2016-0100 - Resp 1 - Final.
Accession Number: ML15349A412
Date Released: Wednesday, December 23, 2015
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML15349A598 - FOIA/PA-2016-0100 - Resp 1 - Final. (4 page(s), 12/15/2015)
- ML15349A596 - Secured Transportation Services (STS), RE: Truck Route Approval Request, Byron to Idaho National Laboratory. (60 page(s), 7/3/2014)
- ML14225A234 - Acceptance Letter for Highway Route Approval Application for Byron Nuclear Generation Station to Idaho National Labs. (3 page(s), 8/15/2014)
- ML14233A205 - Approval of Truck Route No. 247 Highway Route Application from Byron Nuclear Generation Station to Idaho National Lab. (2 page(s), 8/21/2014)
- ML15125A410 - Route Approval Application (NRC Route No. 250) Route: Byron Generating Station, Byron, Il To The Savannah River Site, Near Aiken, SC. (2 page(s), 5/6/2015)
- ML15152A007 - Route Approval Byron to Savanna River STS Letter May 2015. (2 page(s), 6/1/2015)
- ML15243A138 - Route Approval Application (NRC Route No. 251) Route: North Anna Power Station, Mineral, VA To Oak Ridge National Laboratory, Oak Ridge, TN. (2 page(s), 9/1/2015)
- ML15273A333 - Approval STS 251 N Anna to ORNL Sept 2015. (2 page(s), 9/30/2015)
- ML15051A105 - Highway Route Application, Route 248, for Shipment from North Anna Generation Station to Idaho National Laboratories. (2 page(s), 3/4/2015)
- ML15077A157 - Approval of Truck Route 248 Highway Route Application: North Anna Nuclear Generation Station, Mineral, Virginia to Idaho National Laboratory Near Scoville, Idaho. (2 page(s), 3/19/2015)