Home > NRC Library > ADAMS Public Documents
Perry Nuclear Power Plant - Request for Licensing Action to Revise the Emergency Plan.
Accession Number: ML15316A507
Date Released: Monday, December 14, 2015
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML15316A508 - Perry Nuclear Power Plant - Request for Licensing Action to Revise the Emergency Plan. (626 page(s), 10/29/2015)
- ML15316A511 - Calculation EP-EALCALC-PNPP-1401, Rev. 0, "Perry Nuclear Power Plant - Radiological Effluent EAL Values." (23 page(s), 2/18/2015)
- ML15316A512 - Calculation EP-EALCALC-PNPP-1402, Rev. 0, "Perry Nuclear Power Plant - Containment Radiation EAL Values." (16 page(s), 12/5/2014)
- ML15316A514 - Calculation PRDC-0014, Rev. 5, "Division 1, 125 VDC System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation." (640 page(s), 1/17/2014)
- ML15316A515 - Calculation PRDC-0015, Rev. 2, "Division 2,125 VDC System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation." (288 page(s), 3/26/2008)
- ML15316A516 - Calculation PRDC-0015, Rev. 2, Addendum A01, "Division 2,125 VDC System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation." (29 page(s), 7/22/2008)
- ML15316A517 - Calculation PRDC-0015, Rev. 2, Addendum A02, "Division 2,125 VDC System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation." (16 page(s), 8/8/2008)
- ML15316A513 - Calculation PRDC-0015, Rev. 2, Addendum A03, "Division 2,125 VDC System Load Evaluation, Voltage Drop, Battery/Battery Charger Sizing Calculation." (34 page(s), 9/15/2011)