Home > NRC Library > ADAMS Public Documents
Korea Hydro & Nuclear Power Co., Ltd, Submittal of Responses to SEB Issues for DCD Sections 3.3, 3.4.2, and 3.5.3.
Accession Number: ML15301A917
Date Released: Friday, November 6, 2015
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML15301A918 - Korea Hydro & Nuclear Power Co., Ltd., Submittal of Responses to SEB Issues for DCD Sections 3.3, 3.4.2, and 3.5.3. (4 page(s), 10/28/2015)
- ML15301A919 - SEB Issue List Regarding APR1400 DC FSAR 3.3 "Wind and Tornado Loadings." (18 page(s), 10/28/2015)
- ML15301A920 - SEB Issue List Regarding APR 1400, FSAR 3.4.2, "Analysis Procedures." (16 page(s), 10/28/2015)
- ML15301A921 - SEB Issue List Regarding APR 1400, FSAR 3.5.3 "Barrier Design Procedures." (14 page(s), 10/28/2015)