Home > NRC Library > ADAMS Public Documents
Monticello - Extended Power Uprate: Submittal of Power Ascension Testing Results for Replacement Steam Dryer.
Accession Number: ML15289A082
Date Released: Monday, October 26, 2015
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML15289A073 - Monticello - Submittal of Power Ascension Testing Results for Replacement Steam Dryer. (25 page(s), 10/12/2015)
- ML15289A074 - Enclosure 5, WCAP-17252-NP, Revision 5, "Acoustic Loads Definition for the Monticello Steam Dryer Replacement Project." (35 page(s), 9/30/2015)
- ML15289A075 - Enclosure 6, WCAP-17549-NP, Revision 3, "Monticello Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads Using ACE." (91 page(s), 10/31/2015)
- ML15289A076 - Enclosure 7, WCAP-18604-NP, Revision 0, "Monticello EPU Main Steam Line Strain Data Evaluation Report." (61 page(s), 9/30/2015)