Home > NRC Library > ADAMS Public Documents
10/05/2015, Summary of Public Meeting with Duke Energy Process Inc., To Discuss Fuel Reload Design Methodology Reports and Proposed License Amendment Request Re: The Shearon Harris Nuclear Power Plant, Unit 1 and H.B Robinson Steam Electric Plant, Unit 2
Accession Number: ML15280A229
Date Released: Friday, November 27, 2015
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML15280A253 - 10/05/15 Summary of Mtg. with Duke Energy Progress Inc. to Discuss Fuel Reload Design Methodology Reports & Proposed License Amendment Request Re: Shearon Harris Nuclear Power Plant Unit 1 and H.B. Robinson Steam Electric Plant Unit No. 2 (MF6701/MF6702) (4 page(s), 11/25/2015)
- ML15261A600 - Shearon Harris, Unit 1, and H.B. Robinson, Unit 2 - Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted). (35 page(s), 9/18/2015)
- ML15265A409 - 10/05/2015 Pre-Submittal Meeting with Duke Energy Progress, Inc. to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Regarding H. B. Robinson Steam Electric Plant, Unit No. 2, and Shearon Harris Nuclear Power Plant, Unit 1 (2 page(s), 9/22/2015)