NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards documents that were made available to staff by Duke Energy Corp during evaluation of high pressure injection weld crack in Oconee Unit 2 during 1997.

Accession Number: ML15219A113

Date Released: Monday, June 1, 2015

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer