Home > NRC Library > ADAMS Public Documents
5/21/2015 Pre-Submittal Meeting with Dominion - Removal of Severe Line Outage Detection at Millstone Power Station (TAC Nos. MF6189 and MF6190).
Accession Number: ML15162A854
Date Released: Tuesday, June 16, 2015
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML15128A386 - 05/21/2015 FORTHCOMING MEETING WITH DOMINION NUCLEAR CONNECTICUT, INC. (DNC), TO DISCUSS PRE-SUBMITTAL REQUEST RELATED TO NOTICE OF VIOLATION EA-14-126, PROPOSING CHANGES TO THE MILLSTONE POWER STATION, UNITS 2 AND 3, OFFSITE POWER SYSTEM (MF6189/MF6190) (2 page(s), 5/8/2015)
- ML15155B369 - Millstone Power Station, Unit Nos. 2 and 3 - Dominion Nuclear Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on May 21, 2015. (26 page(s), 5/21/2015)
- ML15162A866 - Summary of May 21, 2015 Meeting With Dominion Nuclear Connecticut, Inc. to Discuss Pre-Submittal of License Amendment Request For Removal of Severe Line Outage Detection At Millstone Power Station (TAC Nos. MF6189 and MF6190). (4 page(s), 6/16/2015)