NRC Logo

Home > NRC Library > ADAMS Public Documents

RO:on 970422,unit 2 was shutdown due to leak in RCS.Caused by crack in weld for pipe to safe-end connection at RCS nozzle for HPI sys A1 injection line.JCO submitted for units 1 & 3 on 970428.Addl info encl to support unit 2 operation.

Accession Number: ML15118A498

Date Released: Monday, June 1, 2015

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer