NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards draft analyses by NRR & AEOD on design & operational characteristics of emergency electrical supply sys for plants.Meeting to discuss comments will be scheduled within 60 days of ltr,to be followed by final rept.

Accession Number: ML15118A443

Date Released: Sunday, November 8, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer