Home > NRC Library > ADAMS Public Documents
Turkey Point, Unit 3 - Inservice Inspection Plan - Fifth Inspection Interval, Relief Request No. 1, Revision 1.
Accession Number: ML15077A213
Date Released: Thursday, March 26, 2015
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML15077A214 - Turkey Point, Unit 3 - Inservice Inspection Plan - Fifth Inspection Interval, Relief Request No. 1, Revision 1. (20 page(s), 3/2/2015)
- ML15077A215 - WCAP-17973-NP, Revision 1, "Turkey Point, Units 3 and 4, Pressurizer Heater Sleeve Flaw Evaluation to Support Half-Nozzle Repairs," Enclosure 1 (Non-Proprietary). (40 page(s), 2/28/2015)