FY15(09/15) - 50423 MILLSTONE U3 Initial OL Exam (Fac Dev) (U01903)
Accession Number: ML15072A211
Date Released: Monday, February 14, 2022
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML15078A430 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS-MILLSTONE POWER STATION, UNIT 3. (3 page(s), 3/18/2015)
- ML15243A191 - Initial Operator Licensing Operating Test And Written Examination Approval - Millstone Power Station, Unit 3. (3 page(s), 8/31/2015)
- ML15281A141 - Millstone, Unit 3 - NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2). (6 page(s), 8/14/2015)
- ML15281A146 - Millstone Unit 3 - Draft Operating Exam (Sections A, B, and C) (Folder 2). (485 page(s), 7/16/2015)
- ML15281A139 - Millstone, Unit 3 - Handouts to Applicants Summary of References (Folder 3). (1 page(s), 8/20/2015)
- ML15281A143 - Millstone, Unit 3 - Draft - Outlines (Folder 2). (25 page(s), 6/11/2015)
- ML15281A147 - Millstone, Unit 3 - Final Outlines (Folder 3). (21 page(s), 8/20/2015)
- ML15281A140 - Millstone, Unit 3 - Final Operating Exam (Sections A, B, and C) (Folder 3). (465 page(s), 8/20/2015)
- ML15281A144 - Millstone, Unit 3 - Draft Written Exam (Folder 2). (114 page(s), 7/16/2015)
- ML15281A142 - Millstone, Unit 3 - NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2). (2 page(s), 7/24/2015)
- ML15281A148 - Millstone, Unit 3 - Final Written Examination with Answer Key (401-5 Format) (Folder 3). (114 page(s), 8/20/2015)
- ML15308A010 - ER 05000423/2015301; September 14 to 18, 2015 and September 21, 2015; Millstone Power Station, Unit 3; Initial Operator Licensing Examination Report. (10 page(s), 11/2/2015)
- ML15357A489 - Millstone, Unit 3 - Final QA/Related Forms (Folder 1). (15 page(s), 8/31/2015)