Home > NRC Library > ADAMS Public Documents
Meeting Summary Package Of July 22, 2014, Meeting With The Nuclear Energy Institute (NEI) On Generic Safety Issue (GSI) 191, "Assessment Of Debris Accumulation On PWR [Pressurized Water Reactor] Sumps".
Accession Number: ML15063A375
Date Released: Thursday, March 12, 2015
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14143A246 - July 22, 2014, Notice of Forthcoming Meeting with Nuclear Energy Institute (NEI) on Generic Safety Issue (GSI) 191, "Assessment of Debris Accumulation on PWR Sumps." (4 page(s), 6/30/2014)
- ML15063A359 - July 22, 2014, Summary Of Meeting With The Nuclear Energy Institute (NEI) On Generic Safety Issue (GSI) 191, "Assessment Of Debris Accumulation On PWR [Pressurized Water Reactor] Sumps." (2 page(s), 3/11/2015)
- ML14204A233 - Slides from 7/22/14 Public Meeting with NEI re: GSI-191 (GL 2004-02) Issue Resolution Strategy, "A Simplified Risk-Informed Approach". (21 page(s), 7/22/2014)
- ML15063A387 - Attendees from July 22, 2014 NEI Meeting on GSI-191. (3 page(s), 7/22/2014)