Home > NRC Library > ADAMS Public Documents
Remedial Action Progress Report First Quarter 2014.
Accession Number: ML15030A230
Date Released: Thursday, February 5, 2015
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML15030A163 - Remedial Action Progress Report First Quarter 2014. (0 page(s), 9/22/2014)
- ML15030A242 - Appendix A, Mass Flux Calculations. (7 page(s), 9/22/2014)
- ML15030A243 - Figure 1, Site Location Map. (1 page(s), 9/22/2014)
- ML15030A244 - Figure 2, Station Layout Map. (1 page(s), 9/22/2014)
- ML15030A245 - Figure 3, Salem Generating Station Layout Map. (1 page(s), 9/22/2014)
- ML15030A246 - Figure 4, Station Shallow Groundwater Elevation Contours - February 2014. (1 page(s), 9/22/2014)
- ML15030A247 - Figure 5, Salem Generating Station Hydrogeologic Cross Section A-A'. (1 page(s), 9/22/2014)
- ML15030A248 - Figure 6, Salem Generating Station Hydrogeologic Cross Section B-B'. (1 page(s), 9/22/2014)
- ML15030A249 - Figure 7, Salem Generating Station Hydrogeologic Cross Section C-C'. (1 page(s), 9/22/2014)
- ML15030A250 - Figure 8,Salem Generating Station Hydrogeologic Cross Section D-D'. (1 page(s), 9/22/2014)
- ML15030A251 - Figure 9, Salem Generating Station Hydrogeologic Cross Section E-E'. (1 page(s), 9/22/2014)
- ML15030A275 - Figure 10, Precipitation Measurements. (1 page(s), 9/22/2014)
- ML15030A276 - Figure 11, Station Wind Summary - Q1 2014. (1 page(s), 9/22/2014)
- ML15030A279 - Figure 13, Tritium Isoconcentration Map - March 2014. (1 page(s), 9/22/2014)
- ML15030A280 - Figure 14, Historic Tritium Recovered Through Well Field Operation. (1 page(s), 9/22/2014)
- ML15030A281 - Figure 15, Salem Unit 1 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation. (1 page(s), 9/22/2014)
- ML15030A282 - Figure 16, Salem Unit 2 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation. (1 page(s), 9/22/2014)
- ML15030A283 - Table 01, Well Construction Details. (3 page(s), 9/22/2014)
- ML15030A284 - Table 02, Sample Collection Schedule - First & Second Quarter 2014. (1 page(s), 9/22/2014)
- ML15030A294 - Table 03, Effluent Data Tritium Activity. (1 page(s), 9/22/2014)
- ML15030A295 - Table 04, Groundwater Measurements and Elevations - First Quarter 2014. (1 page(s), 9/22/2014)
- ML15030A296 - Table 05, Groundwater Analytical Results (1.22.2003 through 3.31.2014). (72 page(s), 9/22/2014)
- ML15030A298 - Table 06A, Groundwater Tritium Analytical Results for Well AC. (1 page(s), 9/22/2014)
- ML15030A299 - Table 06B, Groundwater Analytical Results for Well AC. (1 page(s), 9/22/2014)
- ML15030A300 - Table 07, Unit 1 Seismic Gap Drain Tritium Analytical Results. (3 page(s), 9/22/2014)
- ML15030A301 - Table 08, Unit 2 Seismic Gap Drain Tritium Analytical Results. (3 page(s), 9/22/2014)