Home > NRC Library > ADAMS Public Documents
Korea Hydro-Nuclear Power Co., Ltd (Design Control Document)
Accession Number: ML15006A059
Date Released: Tuesday, January 27, 2015
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML15006A037 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Submittal Letter (14 page(s), 12/23/2014)
- ML15006A038 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Environmental Report (93 page(s), 12/23/2014)
- ML15006A039 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier1 (681 page(s), 12/23/2014)
- ML15006A040 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter01-Introduction and General Description of the Plant (338 page(s), 12/23/2014)
- ML15006A041 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter02-Site Characteristics (69 page(s), 12/23/2014)
- ML15006A042 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter03-Design of Structures, Systems, Components, and Equipment (1381 page(s), 12/23/2014)
- ML15006A043 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter04-Reactor (281 page(s), 12/23/2014)
- ML15006A044 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter05-Reactor Coolant System and Connecting Systems (373 page(s), 12/23/2014)
- ML15006A045 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter06-Engineered Safety Features (804 page(s), 12/23/2014)
- ML15006A046 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter07-Instrumentation and Controls (474 page(s), 12/23/2014)
- ML15006A047 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter08-Electric Power (166 page(s), 12/23/2014)
- ML15006A048 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter09-Auxiliary Systems (1523 page(s), 12/23/2014)
- ML15006A049 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter10-Steam and Power Conversion System (263 page(s), 12/23/2014)
- ML15006A050 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter11-Radioactive Waste Management (289 page(s), 12/23/2014)
- ML15006A051 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter12-Radiation Protection (323 page(s), 12/23/2014)
- ML15006A052 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter13-Conduct of Operations (31 page(s), 12/23/2014)
- ML15006A053 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter14-Verification Programs (402 page(s), 12/23/2014)
- ML15006A054 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter15-Transient and Accident Analyses (817 page(s), 12/23/2014)
- ML15006A055 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter16-Technical Specifications (989 page(s), 12/23/2014)
- ML15006A056 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter17-Quality Assurance and Reliability Assurance (52 page(s), 12/23/2014)
- ML15006A057 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter18-Human Factors Engineering (99 page(s), 12/23/2014)
- ML15006A058 - Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier2 Chapter19-Probabilistic Risk Assessment and Severe Accident Evaluation (1587 page(s), 12/23/2014)