Home > NRC Library > ADAMS Public Documents
07/18/2014 Summary of Meeting on BWRVIP-62, Revision 1, "BWR Vessel and Internals Project, Technical Basis for Inspection Relief for BWR Internal Components with Hydrogen Injection."
Accession Number: ML14323A216
Date Released: Wednesday, November 26, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14030A375 - BWRVIP-62 Additional RAI Request Letter. (6 page(s), 2/11/2014)
- ML14323A263 - 07/18/2014 Summary of Meeting on BWRVIP-62, Revision 1, "BWR Vessel and Internals Project, Technical Basis for Inspection Relief for BWR Internal Components with Hydrogen Injection." (4 page(s), 11/20/2014)
- ML14129A280 - 07/18/2014 Meeting Notice with the Electric Power Research Institute on Boiling Water Reactor Vessel and Internals Project Topical Report 62 (BWRVIP-62)"BWR Vessel and Internals Project, Technical Basis for Inspection Relief for BWR Internal Components". (2 page(s), 6/4/2014)
- ML14212A100 - Request for Additional Information for Boiling Water Reactor (BWR) Vessel and Internals Project, Technical Basis Basis for Inspection Relief for BWR Internal Components with Hydrogen Injection (TAC ME8538). (5 page(s), 8/27/2014)
- ML14205A603 - BWRVIP-62 Rev. 1, Pre-RAI Submittal Meeting (July 18, 2014). (133 page(s), 7/18/2014)