Home > NRC Library > ADAMS Public Documents
NRC Groundwater Characterization Question, PSEG Nuclear, LLC, Salem Generation Station.
Accession Number: ML14316A124
Date Released: Thursday, November 20, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14316A120 - Response to NRC Groundwater Characterization Question, PSEG Nuclear, LLC, Salem Generation Station. (1 page(s), 10/17/2014)
- ML14316A369 - Final Well AA-V Installation Report 031214. (27 page(s), 3/31/2014)
- ML14316A379 - Well AA-V Installation Report - Appendix A - Monitoring Well Certification Form B. (11 page(s), 3/31/2014)
- ML14316A328 - Well AA-V Installation Report - Appendix B - CB Abandonment Report. (1 page(s), 3/31/2014)
- ML14316A329 - Well AA-V Installation Report - Appendix C - AA-V Construction and Boring Logs. (4 page(s), 3/31/2014)
- ML14316A331 - Well AA-V Installation Report - Appendix D SPECIFIC CAPACITY TEST FOR WELL AA-V. (1 page(s), 3/31/2014)
- ML14316A333 - Well AA-V Installation Report - Appendix E - Summary, Charts and Raw Data. (255 page(s), 3/31/2014)
- ML14316A334 - Well AA-V Installation Report - Appendix F - Well Search Results. (23 page(s), 3/31/2014)
- ML14316A399 - Well AA-V Installation Report - FIG-01 STATION LAYOUT MAP. (1 page(s), 3/31/2014)
- ML14316A400 - Well AA-V Installation Report - FIG-02 REGIONAL CROSS SECTION-2. (1 page(s), 3/31/2014)
- ML14316A397 - Well AA-V Installation Report - FIG-03 FACILITY CROSS SECTION THROUGH AA-V-3. (1 page(s), 3/31/2014)
- ML14316A398 - Well AA-V Installation Report - FIG-04 MONITORING WELLS SCREENED WITHIN THE VINCENTOWN FORMATION-4. (1 page(s), 3/31/2014)
- ML14316A401 - Well AA-V Installation Report - FIG-05 VINCENTOWN FORMATION MEAN HYDRAULIC FLUCTUATION STUDY RESULTS MAP - AUGUST 2013-5. (1 page(s), 3/31/2014)
- ML14316A402 - Well AA-V Installation Report - FIG-06 POTABLE WELL LOCATIONS IN LOWER ALLOWAYS CREEK ELSINBORO AND GREENWICH TOWNSHIPS. (1 page(s), 3/31/2014)
- ML14316A406 - Well AA-V Installation Report - Table 1 Well Construction Details. (1 page(s), 3/31/2014)
- ML14316A407 - Well AA-V Installation Report - Table 2 Groundwater Sample Analytical Results Vincentown Wells. (8 page(s), 3/31/2014)
- ML14316A403 - Well AA-V Installation Report - Table 3 Well AA-V Extended Purge Salem Chemistry Screening Results. (1 page(s), 3/31/2014)
- ML14316A408 - Well AA-V Installation Report - Table 4 Mean Hydraulic Grad Study Results. (1 page(s), 3/31/2014)
- ML14316A409 - Well AA-V Installation Report - Table 5 Well Search Summary. (1 page(s), 3/31/2014)