Home > NRC Library > ADAMS Public Documents
Fermi 3 Final Safety Evaluation Report
Accession Number: ML14296A540
Date Released: Tuesday, November 18, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14303A710 - Letter - Final Safety Evaluation Report For The FERMI 3 Combined License Application. (5 page(s), 11/10/2014)
- ML14321A566 - Letter - Final Safety Evaluation Report For The Fermi Unit 3 Combined License Application. (5 page(s), 11/18/2014)
- ML14287A676 - Table of Contents (29 page(s), 11/18/2014)
- ML14300A223 - List of Abbreviations. (15 page(s), 11/18/2014)
- ML14300A376 - Abstract of the Final Safety Evaluation Report. (2 page(s), 11/18/2014)
- ML14300A222 - Appendix A - Post Combined License Activities - License Conditions, Inspections, Tests, Analyses, and Acceptance Criteria, and Final Safety Analysis Report Commitments. (60 page(s), 11/18/2014)
- ML14302A567 - Appendix B - Chronology of Combined License Application for Fermi Unit 3. (612 page(s), 11/18/2014)
- ML14308A401 - Appendix C - Request for Additional Information. (29 page(s), 11/18/2014)
- ML14279A181 - Appendix D - References. (47 page(s), 11/18/2014)
- ML14302A270 - Appendix E - Principal Contributors. (3 page(s), 11/18/2014)
- ML14302A591 - Appendix F - Report by Advisory Committee on Reactor Safeguards. (11 page(s), 11/18/2014)
- ML14198A557 - Chapter 1 - Introduction and Interfaces. (63 page(s), 11/18/2014)
- ML14246A385 - Chapter 2 - Site Characteristics. (335 page(s), 11/18/2014)
- ML14258B088 - Chapter 3 - Design of Structures, Components, Equipment and Systems. (113 page(s), 11/18/2014)
- ML12306A280 - Chapter 4 - Reactor. (2 page(s), 11/18/2014)
- ML14255A121 - Chapter 5 - Reactor Coolant System and Connected Systems. (31 page(s), 11/18/2014)
- ML14183A622 - Chapter 6 - Engineered Safety Features. (17 page(s), 11/18/2014)
- ML13158A238 - Chapter 7 - Instrumentation and Controls. (1 page(s), 11/18/2014)
- ML14192A986 - Chapter 8 - Electric Power. (28 page(s), 11/18/2014)
- ML14251A364 - Chapter 9 - Auxiliary Systems. (83 page(s), 11/18/2014)
- ML13184A336 - Chapter 10 - Steam and Power Conversion System. (24 page(s), 11/18/2014)
- ML13221A431 - Chapter 11 - Radioactive Waste Management. (30 page(s), 11/18/2014)
- ML13358A219 - Chapter 12 - Radiation Protection (59 page(s), 11/18/2014)
- ML14198A596 - Chapter 13 - Conduct of Operations. (262 page(s), 11/18/2014)
- ML14197A260 - Chapter 14 - Initial Test Program. (60 page(s), 11/18/2014)
- ML12306A506 - Chapter 15 - Safety Analysis. (4 page(s), 11/18/2014)
- ML14196A296 - Chapter 16 - Technical Specifications. (19 page(s), 11/18/2014)
- ML13122A419 - Chapter 17 - Quality Assurance. (41 page(s), 11/18/2014)
- ML13162A357 - Chapter 18 - Human Factors Engineering. (2 page(s), 11/18/2014)
- ML14198A009 - Chapter 19 - Probabilistic Risk Assessment. (16 page(s), 11/18/2014)
- ML14238A661 - Chapter 20 - Fukushima Near-Term Task Force Recommendations. (26 page(s), 11/18/2014)