Home > NRC Library > ADAMS Public Documents
Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 June 2014 Submittal of the Updated Final Safety Analysis Report (UFSAR), Revision 2 and Tier 1, Revision 2.
Accession Number: ML14206A861
Date Released: Wednesday, July 30, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14206A850 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 June 2014 Submittal of the Updated Final Safety Analysis Report (UFSAR), Revision 2 and Tier 1, Revision 2. (3 page(s), 7/22/2014)
- ML14206A941 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 UFSAR Tier 1 Revision 2. (560 page(s), 7/22/2014)
- ML14206A943 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 1, Introduction and General Description of the Plant. (414 page(s), 7/22/2014)
- ML14206A957 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 2, Table of Contents. (17 page(s), 7/22/2014)
- ML14206A958 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 2, Site Characteristics. (8 page(s), 7/22/2014)
- ML14206A959 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 2, Section 2.1 - Geography and Demography. (29 page(s), 7/22/2014)
- ML14206A960 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 2, Section 2.2 - Nearby Industrial, Transportation, and Military Facilities. (35 page(s), 7/22/2014)
- ML14206A995 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 2, Section 2.3 - Meteorology. (130 page(s), 7/22/2014)
- ML14206A994 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 2, Section 2.4 - Hydrologic Engineering. (162 page(s), 7/22/2014)
- ML14206A998 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 2, Section 2.5 - Geology, Seismology, and Geotechnical Engineering. (103 page(s), 7/22/2014)
- ML14206A997 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 2, Section 2.5.3 - Surface Faulting Combined License Information. (13 page(s), 7/22/2014)
- ML14206A996 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 2, Section 2.5.2 - Vibratory Ground Motion. (121 page(s), 7/22/2014)
- ML14206B000 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 2, Section 2.5.4 - Stability and Uniformity of Subsurface Materials and Foundations. (146 page(s), 7/22/2014)
- ML14206B002 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 2, Section 2.5.5 - Combined License Information for Stability of Slopes. (2 page(s), 7/22/2014)
- ML14206B003 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 2, Section 2.5.6 - Combined License Information for Embankments and Dams. (1 page(s), 7/22/2014)
- ML14206B018 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Table of Contents. (26 page(s), 7/22/2014)
- ML14206B019 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Design of Structures, Components, Equipment and Systems, Section 3.1 - Conformance with Nuclear Regulatory Commission General... (29 page(s), 7/22/2014)
- ML14206B020 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Section 3.2 - Classification of Structures, Components, and Systems. (94 page(s), 7/22/2014)
- ML14206B021 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Section 3.3 - Wind and Tornado Loadings. (6 page(s), 7/22/2014)
- ML14206B023 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Section 3.4 - Water Level (Flood) Design. (24 page(s), 7/22/2014)
- ML14206B035 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Section 3.5 - Missile Protection. (15 page(s), 7/22/2014)
- ML14206B036 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Section 3.6 - Protection Against the Dynamic Effects Associated with the Postulated Rupture of Piping. (50 page(s), 7/22/2014)
- ML14206B034 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Section 3.7 - Seismic Design. (108 page(s), 7/22/2014)
- ML14206B037 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Section 3.8 - Design of Category I Structures. (183 page(s), 7/22/2014)
- ML14206B038 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Section 3.9 - Mechanical Systems and Components. (159 page(s), 7/22/2014)
- ML14206B067 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Section 3.10 - Seismic and Dynamic Qualification of Seismic Category I Mechanical and Electrical Equipment. (7 page(s), 7/22/2014)
- ML14206B069 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Section 3.11 - Environmental Qualification of Mechanical and Electrical Equipment. (57 page(s), 7/22/2014)
- ML14206B070 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Appendix 3A - HVAC Ducts and Duct Supports. (3 page(s), 7/22/2014)
- ML14206B071 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Appendix 3B - Leak-Before-Break Evaluation of the AP1000 Piping. (40 page(s), 7/22/2014)
- ML14206B072 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Appendix 3C - Reactor Coolant Loop Analysis Methods. (4 page(s), 7/22/2014)
- ML14206B073 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Appendix 3D - Methodology for Qualifying AP1000 Safety-Related Electrical and Mechanical Equipment. (107 page(s), 7/22/2014)
- ML14206B077 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Appendix 3E - High-Energy Piping in the Nuclear Island. (10 page(s), 7/22/2014)
- ML14206B076 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Appendix 3F - Cable Trays and Cable Tray Supports. (3 page(s), 7/22/2014)
- ML14206B078 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Appendix 3G - Nuclear Island Seismic Analyses. (75 page(s), 7/22/2014)
- ML14206B079 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Appendix 3H - Auxiliary and Shield Building Critical Sections. (78 page(s), 7/22/2014)
- ML14206B080 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 3, Appendix 3I - Evaluation for High Frequency Seismic Input. (72 page(s), 7/22/2014)
- ML14206B085 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 4, Reactor. (193 page(s), 7/22/2014)
- ML14206B086 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 5, Reactor Coolant System and Connected Systems. (199 page(s), 7/22/2014)
- ML14206B087 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 6, Engineered Safety Features. (272 page(s), 7/22/2014)
- ML14206B088 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 7, Instrumentation and Controls. (184 page(s), 7/22/2014)
- ML14206B093 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 8, Electric Power. (87 page(s), 7/22/2014)
- ML14206B100 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 9, Auxiliary Systems. (576 page(s), 7/22/2014)
- ML14206B101 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 10, Steam and Power Conversion. (138 page(s), 7/22/2014)
- ML14206B102 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 11, Radioactive Waste Management. (175 page(s), 7/22/2014)
- ML14206B110 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 12, Radiation Protection. (195 page(s), 7/22/2014)
- ML14206B113 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 13, Conduct of Operation. (83 page(s), 7/22/2014)
- ML14206B114 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 14, Initial Test Program. (193 page(s), 7/22/2014)
- ML14206B115 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 15, Accident Analyses. (640 page(s), 7/22/2014)
- ML14206B117 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 16, Technical Specifications. (54 page(s), 7/22/2014)
- ML14206B118 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 17, Quality Assurance. (33 page(s), 7/22/2014)
- ML14206B164 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 18, Human Factors Engineering. (82 page(s), 7/22/2014)
- ML14206B166 - Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Revision 2, Chapter 19, Probabilistic Risk Assessment. (382 page(s), 7/22/2014)