NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Suppl 1 to XN-NF-84-74, "Plant Transient Analysis for HB Robinson Unit 2 at 2300 MWt W/Increased FNH, 'Suppl 1:Analysis of Control Rod Misoperation Events (Rod Cluster Control Assembly Misalignments).'"

Accession Number: ML14192A492

Date Released: Tuesday, April 21, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer