Home > Site Help > Search Results

Forwards draft EMF-92-112, "HB Robinson Steam Electric Plant Unit 2,Small Break LOCA Analysis." Rept details change in acceptable evaluation model.Util planning change to COLR in mid-May to increase current core power distribution limits.

Accession Number: ML14184B028

Date Released: Friday, August 29, 2014

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer