NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards insp rept 50-261/96-12 on 960928-1116 & notice of violation.Inadequate configuration controls for performing reactor cooling sys pressure isolation valve leakage testing resulted in water hammer event.

Accession Number: ML14181A853

Date Released: Saturday, November 7, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer