Home > NRC Library > ADAMS Public Documents
IR 05000445-13-004, 05000446-13-004; 6/27/2013 - 9/25/2013; Comanche Peak Nuclear Power Plant, Units 1 and 2 Integrated Resident and Regional Report; Equipment Alignments, Maintenance Effectiveness, Operability Evaluations and Functionality Assessments.
Accession Number: ML14149A458
Date Released: Thursday, May 29, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13310C184 - IR 05000445-13-004, 05000446-13-004; on 6/27/2013 - 9/25/2013; Comanche Peak Nuclear Power Plant, Units 1 & 2, Integrated Inspection Report; Equipment Alignments, Maintenance Effectiveness, Operability Evaluations and Functionality Assessments..... (47 page(s), 11/6/2013)
- ML13351A374 - Comanche Peak - Response to Finding Documented in NRC Inspection Report 05000445-13-004 & 05000446-13-004. (3 page(s), 12/5/2013)
- ML14002A355 - Response to Comanche Peak Denial of Finding in NRC Integrated Inspection Report 05000445-13-004 and 05000446-13-004. (2 page(s), 1/2/2014)
- ML14148A511 - IR 05000445-13-004, 05000446-13-004; on 6/27/2013 - 9/25/2013; Comanche Peak Nuclear Power Plant, Units 1 and 2 Integrated Resident and Regional Report; Equipment Alignments, Maintenance Effectiveness, Plant Modifications, Post-Maintenance Testing. (49 page(s), 5/28/2014)