Home > NRC Library > ADAMS Public Documents
FOIA/PA-2014-0210 - Resp 1 - Partial.
Accession Number: ML14133A259
Date Released: Tuesday, May 20, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14133A247 - FOIA/PA-2014-0210 - Resp 1 - Partial. (1 page(s), 5/12/2014)
- ML14133A246 - FOIA/PA-2014-0210 - Resp 1 - Partial. Group A. (Records Publically Available). (3 page(s), 5/9/2014)
- ML091520658 - Fort Calhoun Station-Initial Information Request for NRC Triennial Baseline Component Design Bases Inspection NRC Inspection Report 05000285-09-006. (8 page(s), 6/1/2009)
- ML093641134 - IR 05000285-09-006; August 24-28, 2009, and September 8-18, 2009; Fort Calhoun Station: Baseline Inspection, NRC Inspection Procedure 71111.21, Component Design Basis Inspection. (63 page(s), 12/30/2009)
- ML101970547 - IR 05000285-10-007; on 01/01/2010 - 06/21/2010; Omaha Public Power District Fort Calhoun Station, Inspection Procedure 92701, Followup. (32 page(s), 7/15/2010)
- ML102160648 - 08/18/2010 Meeting Notice: Regulatory Conference with Omaha Public Power District re Inadequate External Flood Protection Procedure. (4 page(s), 8/4/2010)
- ML102380230 - 2010/08/26-Summary of Meeting with Omaha Public Power District Regarding A Preliminary Substantial Finding. (24 page(s), 8/26/2010)
- ML102800238 - Press Release-IV-10-034: NRC Finds Problems with the Fort Calhoun Nuclear Plant’s Flood Protection Strategy had Substantial Safety Significance. (2 page(s), 10/7/2010)
- ML102800342 - EA-10-084 - Final Significance Determination for a Yellow Finding and Notice of Violation, NRC Inspection Report 05000285-10-007, Fort Calhoun Station. (11 page(s), 10/6/2010)
- ML102800595 - Assessment Followup letter - Fort Calhoun Station. (4 page(s), 10/7/2010)
- ML102920720 - IR 05000285-10-008 for Calhoun. (4 page(s), 10/19/2010)
- ML103120073 - NRC Inspection Report 05000285-10-008, Reply to a Notice of Violation; EA-10-084. (8 page(s), 11/5/2010)
- ML13192A501 - IR 05000285-13-010; on 4/8/2013 - 5/29/2013; Fort Calhoun Station, Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs or One Red Input. (48 page(s), 7/11/2013)
- ML13197A261 - IR 05000285-13-008, on 01/14/2013 06/10/2013, Fort Calhoun Station, Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs or One Red Input. (275 page(s), 7/16/2013)
- ML13217A256 - G20130565/LTR-13-0654-Ticket - Senator Edward J. Markey Ltr. re: Consideration of Changes to Guidance on Foreign Ownership of Nuclear Licenses. (2 page(s), 8/2/2013)
- ML13260A525 - G20130675/LTR-13-0742 - Senator Edward Markey Ltr re: Nuclear Regulatory Commission's Draft Study on the Potential Consequences of a Severe Earthquake on the Spent Fuel Pools of United States Mark 1 Boiling Water Reactors. (3 page(s), 9/17/2013)
- ML13260A527 - G20130675/LTR-13-0742-Ticket - Senator Edward Markey Ltr re: Nuclear Regulatory Commission's Draft Study on the Potential Consequences of a Severe Earthquake on the Spent Fuel Pools of United States Mark 1 Boiling Water Reactors. (2 page(s), 9/17/2013)
- ML13273A291 - 09-19-13 Acknowledgement Ltr - Honorable Edward J. Markey - BWRs. (1 page(s), 9/19/2013)
- ML13318A869 - LTR-13-0884 Sen Edward Markey and Sen Bernard Sanders Letter re: Sufficient Funds to Operate Entergy's Plants After Entergy Officials Contacted Senior NRC Officials to Complain about Pending NRC Oversight. (3 page(s), 11/14/2013)