Home > NRC Library > ADAMS Public Documents
Inspection Manual Change Notice 14-011.
Accession Number: ML14126A015
Date Released: Friday, May 9, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14129A003 - Inspection Manual Change Notice 14-011. (2 page(s), 5/9/2014)
- ML14126A853 - Table of Contents for Inspection Manual Change Notice 14-011. (50 page(s), 5/9/2014)
- ML100220219 - IMC 0308, Attachment 3, Appendix L - Technical Basis for B.5.b Significance Determination Process (5 page(s), 5/9/2014)
- ML13050A933 - IMC0609 Appendix G Shutdown Operations Significance Determinations Process. (13 page(s), 5/9/2014)
- ML13050A934 - IMC-0609 Appendix G, Attachment 1 - Shutdown Operations SDP Phase 1 Initial Screening and Characterization of Findings. (15 page(s), 5/9/2014)
- ML14028A249 - IMC 2630, Mixed Oxide Fuel Fabrication Facility Construction Inspection Program. (59 page(s), 5/9/2014)
- ML14083A387 - IP 65001.D Inspection of the ITAAC-Related Operational Testing Program. (9 page(s), 5/9/2014)