Home > NRC Library > ADAMS Public Documents
GE-Hitachi ESBWR Design Control Document Tier, Revision 10.
Accession Number: ML14104A929
Date Released: Monday, April 14, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14101A028 - ESBWR Standard Plant Design Certification Application Design Control Document, Revision 10, Tier 1 and Tier 2 - Resubmittal. (4 page(s), 4/1/2014)
- ML14100A493 - GE-Hitachi ESBWR Design Control Document Tier 1, Rev. 10 - ESBWR DCD Revision 10 Tier 1 (853 page(s), 4/1/2014)
- ML14100A495 - GE-Hitachi ESBWR Design Control Document Tier 1, Rev. 10 - ESBWR DCD Revision 10 Tier 1 Change List (5 page(s), 4/1/2014)
- ML14100A498 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 00 - Table of Contents (230 page(s), 4/1/2014)
- ML14100A499 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 01 - Introduction and General Description of Plant (410 page(s), 4/1/2014)
- ML14100A500 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 01 Change List (5 page(s), 4/1/2014)
- ML14100A501 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 01A to 01D - Introduction and General Description of Plant (96 page(s), 4/1/2014)
- ML14100A503 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 01A to 01D Change List (1 page(s), 4/1/2014)
- ML14100A504 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 02 - Site Characteristics (39 page(s), 4/1/2014)
- ML14100A505 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 02 Change List (1 page(s), 4/1/2014)
- ML14100A506 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 03.01 to 03.08 - Design of Structures, Components, Equipment, and Systems (349 page(s), 4/1/2014)
- ML14100A507 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 03.01 to 03.08 Change List (1 page(s), 4/1/2014)
- ML14100A508 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 03.09 to 03.11 - Design of Structures, Components, Equipment, and Systems (174 page(s), 4/1/2014)
- ML14100A509 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 03.09 to 03.11 Change List (3 page(s), 4/1/2014)
- ML14100A510 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 03A to 03F - Design of Structures, Components, Equipment, and Systems (335 page(s), 4/1/2014)
- ML14100A512 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 03A to 03F Change List (1 page(s), 4/1/2014)
- ML14100A513 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 03G to 03L - Design of Structures, Components, Equipment, and Systems (524 page(s), 4/1/2014)
- ML14100A515 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 03G to 03L Change List (7 page(s), 4/1/2014)
- ML14100A517 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 04 - Reactor (180 page(s), 4/1/2014)
- ML14100A518 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 04 Change List (1 page(s), 4/1/2014)
- ML14100A519 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 05 - Reactor Coolant System and Conected Systems (165 page(s), 4/1/2014)
- ML14100A520 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 05 Change List (1 page(s), 4/1/2014)
- ML14100A521 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 06 - Engineered Safety Features (645 page(s), 4/1/2014)
- ML14100A522 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 06 Change List (1 page(s), 4/1/2014)
- ML14100A523 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 07 - Instrumentation and Control Systems (518 page(s), 4/1/2014)
- ML14100A524 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 07 Change List (1 page(s), 4/1/2014)
- ML14100A525 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 08 - Electric Power (74 page(s), 4/1/2014)
- ML14100A526 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 08 Change List (1 page(s), 4/1/2014)
- ML14100A527 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 09 - Auxiliary Systems (331 page(s), 4/1/2014)
- ML14100A528 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 09 Change List (1 page(s), 4/1/2014)
- ML14100A529 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 09A - Auxiliary Systems (269 page(s), 4/1/2014)
- ML14100A530 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 09A Change List (1 page(s), 4/1/2014)
- ML14100A531 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 09B - Auxiliary Systems (16 page(s), 4/1/2014)
- ML14100A532 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 09B Change List (1 page(s), 4/1/2014)
- ML14100A533 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 10 - Steam and Power Conversion System (92 page(s), 4/1/2014)
- ML14100A534 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 10 Change List (1 page(s), 4/1/2014)
- ML14100A536 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 11 - Radioactive Waste Management (144 page(s), 4/1/2014)
- ML14100A537 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 11 Change List (1 page(s), 4/1/2014)
- ML14100A539 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 12 - Radiation Protection (349 page(s), 4/1/2014)
- ML14100A540 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 12 Change List (1 page(s), 4/1/2014)
- ML14100A541 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 13 - Conduct of Operations (22 page(s), 4/1/2014)
- ML14100A544 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 13 Change List (1 page(s), 4/1/2014)
- ML14100A545 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 14 - Initial Test Program (157 page(s), 4/1/2014)
- ML14100A546 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 14 Change List (1 page(s), 4/1/2014)
- ML14100A547 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 15 - Safety Analyses (580 page(s), 4/1/2014)
- ML14100A548 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 15 Change List (1 page(s), 4/1/2014)
- ML14100A550 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 16 - Generic Technical Specifications (286 page(s), 4/1/2014)
- ML14100A551 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 16 Change List (1 page(s), 4/1/2014)
- ML14100A552 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 16B - GTS Bases (537 page(s), 4/1/2014)
- ML14100A553 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 16B Change List (2 page(s), 4/1/2014)
- ML14100A554 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 17 - Quality Assurance (26 page(s), 4/1/2014)
- ML14100A555 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 17 Change List (1 page(s), 4/1/2014)
- ML14100A556 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 18 - Human Factors Engineering (65 page(s), 4/1/2014)
- ML14100A557 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 18 Change List (1 page(s), 4/1/2014)
- ML14100A559 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 19 - Probabilistic Risk Assessment and Severe Accidents (274 page(s), 4/1/2014)
- ML14100A560 - GE-Hitachi ESBWR Design Control Document Tier 2, Rev. 10 - Chapter 19 Change List (1 page(s), 4/1/2014)