FY14(09/14)-50333 JA FITZPATRICK Initial OL Exam (Fac Dev) (U01888)
Accession Number: ML14101A125
Date Released: Monday, February 14, 2022
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14105A272 - Senior Reactor and Reactor Operator Initial License Examinations - James A. Fitzpatrick. (4 page(s), 4/15/2014)
- ML14260A002 - Initial Operator Licensing Operating Test and Written Examination Approval - James A. FitzPatrick Nuclear Power Plant. (3 page(s), 9/2/2014)
- ML14261A300 - Fitzpatrick - NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) (2 page(s), 9/8/2014)
- ML14261A278 - Fitzpatrick - NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2). (6 page(s), 9/2/2014)
- ML14261A309 - Fitzpatrick - Draft-Outlines (Folder 2) (30 page(s), 7/23/2014)
- ML14261A315 - Fitzpatrick - Draft Written Exam (Folder 2) (210 page(s), 7/23/2014)
- ML14261A323 - Fitzpatrick - Draft Operating Exam (Sections A, B, and C) (Folder 2) (310 page(s), 7/23/2014)
- ML14318A458 - Fitzpatrick - Final Outlines (Folder 3). (26 page(s), 9/15/2014)
- ML14318A466 - Fitzpatrick - Final Written Examination with Answer Key (401-5 Format) (Folder 2) (209 page(s), 9/15/2014)
- ML14318A474 - Fitzpatrick - Handouts to Applicants (Folder 3). (1 page(s), 9/15/2014)
- ML14318A510 - Fitzpatrick - Final Operating Exam (Sections A, B, and C) (Folder 3). (290 page(s), 9/15/2014)
- ML14329A816 - ER 0500033/2014302; FitzPatrick Nuclear Power Plant Initial Operator Licensing Examination Report. (10 page(s), 11/24/2014)
- ML15007A165 - Fitzpatrick - Final QA/Related Forms (Folder 1). (12 page(s), 11/10/2014)