Home > NRC Library > ADAMS Public Documents
Shearon Harris, Unit 1, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.
Accession Number: ML14072A048
Date Released: Friday, March 21, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14072A051 - Shearon Harris, Unit 1, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. (17 page(s), 2/27/2014)
- ML14072A053 - Shearon Harris, Unit 1, Figure 1 - CAR-2165G-003, Site Plan (Updated). (1 page(s), 2/27/2014)
- ML14072A055 - Shearon Harris, Unit 1, Figure 10 - CAR-2165-G-047, ESW Header Pressurization (Updated). (1 page(s), 2/27/2014)
- ML14072A056 - Shearon Harris, Unit 1, Figure 11 - CAR-2165-G-301, Unit 1 Spent Fuel Pool Make Up (Updated). (1 page(s), 2/27/2014)
- ML14072A057 - Shearon Harris, Unit 1, Figure 12 - CAR-2165-G-0307, Unit 2 Spent Fuel Pool Make Up (Updated). (1 page(s), 2/27/2014)
- ML14072A058 - Shearon Harris, Unit 1, Figure 13 - CAR-2165-G-0805, RCS Injection (Updated). (1 page(s), 2/27/2014)
- ML14072A059 - Shearon Harris, Unit 1, Figure 26 - CAR-2166-G-030, 480 Volt Auxiliary One Line Wiring Diagram (Updated). (1 page(s), 2/27/2014)
- ML14072A060 - Shearon Harris, Unit 1, Figure 27 - CAR-2166-G-0042-S01, 250V DC, 125V DC & 120V Uninterruptible AC One Line Wiring Diagram (Updated). (1 page(s), 2/27/2014)
- ML14072A061 - Shearon Harris, Unit 1, Figure 29 - CAR-2165-G-0050, Containment Spray System. (1 page(s), 2/27/2014)
- ML14072A054 - Shearon Harris, Unit 1, Figure 30 - CAR-2165-G-0062, Fuel Pool Purification System. (1 page(s), 2/27/2014)