Home > NRC Library > ADAMS Public Documents
Web Package for FOIA/PA 2013-0013
Accession Number: ML14065A204
Date Released: Wednesday, March 19, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13039A084 - Generic Failure Rate Evaluation for Jocassee Dam. (3/15/2010)
- ML12363A132 - Information Request Pursuant to 10 CFR 50.54(f) Related to External Flooding, Including Failure of the Jocassee Dam at Oconee Nuclear Station, Units 1, 2, and 3. (8/15/2008)
- ML103490330 - Oconee Nuclear Site, Units 1, 2, and 3, Oconee Response to Confirmatory Action Letter (CAL) 2-10-003. (11/29/2010)
- ML13039A086 - Memorandum to Benjamin Beasley, RES from Lois James, NRR, Subject: Identification of a Generic External Flooding Issue Due to Potential Dam Failures. (7/19/2010)
- ML13064A211 - FOIA/PA-2013-0013 - Resp 1 - Partial. (2/27/2013)
- ML13051A896 - Oconee Nuclear Site, Units 1, 2 and 3, Oconee Response to Confirmatory Action Letter 2-10-003. (6/3/2010)
- ML12363A086 - CAL 2-10-003 - Confirmatory Action Letter- Oconee Nuclear Station, Units 1,2 and 3 Commitments to Address External Flooding Concerns (TAC NOS. ME3065, ME3066 and ME3067 (6/22/2010)
- ML13099A247 - Oconee Nuclear Site, Units 1, 2, and 3, Response to Confirmatory Action Letter (CAL) 2-10-003. (4/29/2011)
- ML12290A070 - FOIA/PA-2013-0013 - The September 18, 2012 email and letter from named individual to Chairman Macfarlane regarding the Lake Jocassee Dam and the threat to Oconee Nuclear Station. (9/16/2012)
- ML13266A175 - FOIA/PA-2013-0013 - Resp 3 - Final. (9/20/2013)
- ML14073A528 - FOIA/PA-2013-0013 - Resp 2 - Partial. (4/10/2013)