Home > NRC Library > ADAMS Public Documents
FY15(09/14) - 50336 MILLSTONE 2 Initial OL Exam (NRC Dev) (TAC U01891)
Accession Number: ML14043A009
Date Released: Monday, February 14, 2022
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14107A421 - Senior Reactor and Reactor Operator Initial License Examination - Millstone Power Station, Unit 2. (3 page(s), 4/17/2014)
- ML14262A252 - Initial Operator Licensing Operating Test Approval (Millstone Power Station, Unit 2). (4 page(s), 9/17/2014)
- ML14303A708 - Millstone, Unit 2. Initial Operator Licensing Written Exam Approval Letter. (4 page(s), 10/30/2014)
- ML15008A196 - Millstone Unit 2 - Draft-Outlines (Folder 2). (33 page(s), 1/5/2015)
- ML15008A062 - Millstone Unit 2 - NRC Comments on Draft Licensee-Developed Exam (Written)(Folder 2). (6 page(s), 1/5/2015)
- ML15008A205 - Millstone, Unit 2 - Draft Written Exam (Folder 2). (222 page(s), 8/23/2014)
- ML15008A229 - Millstone Unit 2 - Draft Operating Exam (Section A, B, and C) (Folder 2). (308 page(s), 8/15/2014)
- ML15007A395 - Millstone Unit 2 - Final Outlines (Folder 3). (33 page(s), 10/30/2014)
- ML15007A403 - Millstone, Unit 2 - Final Written Examination with Answer Key (401-5 Format) (Folder 2). (209 page(s), 11/25/2014)
- ML15007A419 - Millstone, Unit 2 - Handouts to Applicants (Folder 3). (1 page(s), 11/25/2014)
- ML15007A437 - Millstone Unit 2 - Final Operating Exam (Sections A, B, and C) (Folder 3). (314 page(s), 10/30/2014)
- ML15009A074 - Millstone Unit 2 - Post Exam Comments and NRC Resolution of Post-Exam Comments (Folder 1). (18 page(s), 11/25/2014)
- ML15012A241 - ER 05000336/2014301; September 29-October 31, 2014; Millstone Power Station, Unit 2; Initial Operator Licensing Examination Report. (9 page(s), 1/8/2015)
- ML15156A603 - Millstone Unit 2 - Final QA/Related Forms (Folder 1). (12 page(s), 12/29/2014)