Home > NRC Library > ADAMS Public Documents
HB Robinson Initial Exam 2013-301 Final Exam Package.
Accession Number: ML14027A052
Date Released: Thursday, August 6, 2015
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13045A843 - H. B. Robinson Steam Electric Plant - Notification of Licensed Operator Initial Examination 05000261/2013301. (7 page(s), 2/11/2013)
- ML13213A470 - Robinson 05000261/13-301 Written Exam Approval Letter. (3 page(s), 8/1/2013)
- ML13344B147 - H.B. Robinson Initial Exam 2013-301 General Correspondence. (4 page(s), 11/30/2013)
- ML13213A444 - HB Robinson 2013-301 Operating Exam Approval Letter. (2 page(s), 7/25/2013)
- ML13219A180 - HB Robinson Initial Exam 2013-301 Final SRO Written Exam. (109 page(s), 8/6/2013)
- ML13344B140 - H.B. Robinson, Initial Exam 2013-301 Draft Administrative JPMS. (535 page(s), 11/30/2013)
- ML13219A175 - HB Robinson Initial Exam 2013-301 Final RO Written Exam. (80 page(s), 8/6/2013)
- ML13339A754 - HB Robinson Initial Exam 2013-301 Draft Administrative Documents. (27 page(s), 11/30/2013)
- ML13268A158 - ER 05000261-13-301; July 29 - August 1, 2013 and August 6, 2013; H. B. Robinson Steam Electric Plant Unit No. 2; Operator License Examinations. (10 page(s), 9/23/2013)
- ML13339A665 - HB Robinson Initial Exam 2013-301 Draft SRO Written Exam. (180 page(s), 11/30/2013)
- ML13339A840 - H.B. Robinson Initial Exam 2013-301 Draft Sim_IN-Plant JPMs. (292 page(s), 11/30/2013)
- ML13339A774 - HB Robinson Initial Exam 2013-301 Draft RO Written Exam. (391 page(s), 11/11/2013)
- ML14027A044 - HB Robinson Initial Exam 2013-301 Final Administrative Documents. (116 page(s), 1/24/2014)
- ML13344B146 - H.B. Robinson Initial Exam 2013-301 Final Administrative JPMS. (296 page(s), 11/30/2013)
- ML13344B143 - H.B. Robinson Initial Exam 2013-301 Final Simulator Scenarios. (247 page(s), 11/30/2013)
- ML13344B144 - H.B. Robinson Initial Exam 2013-301 Final Sim_IN-Plant JPMs. (297 page(s), 11/30/2013)
- ML13339A779 - HB Robinson Initial Exam 2013-301 Draft Simulator Scenarios. (147 page(s), 11/30/2013)