Home > NRC Library > ADAMS Public Documents
FOIA/PA-2013-0139 - Resp 2 - Partial.
Accession Number: ML13317A687
Date Released: Monday, November 4, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13317A693 - FOIA/PA-2013-0139 - Resp 2 - Partial. (1 page(s), 10/25/2013)
- ML13317A695 - Email T. Hipschman to J. Zimmerman et al., FW: Update on Doel-3 issue. (1 page(s), 8/17/2012)
- ML13317A697 - Email T. Lupold to J. Trapp, RE: Vessel Flaws. (1 page(s), 10/23/2012)
- ML13317A699 - Email P. Wilson to J. Trapp, FW: Doel 3 one pager update after October meeting. (1 page(s), 10/25/2012)
- ML13317A701 - Email M. Deprez to A. Weyn et al., Subj: WG2 - English translation of Areva document. (1 page(s), 11/6/2012)
- ML13317A702 - Email J. Poehler to R. Hardies, RE: the Doel 3 indications presentations for ET LT. (1 page(s), 11/8/2012)
- ML13317A704 - Email C. Fairbanks to J. Poehler, RE: Slides for Doel Briefing next Tuesday. (1 page(s), 11/9/2013)
- ML13317A706 - Email M. Kirk to T. Pope et al., Subj: Foreign Travel Request: Belgium December 15-19 (concerning Doel). (1 page(s), 11/13/2012)
- ML13317A707 - Email B. Tombuyses to P. Ekstrom et al., RE: Doel 3 & Tihange 2 RPV issue - October 16 th meeting - WG2. (2 page(s), 11/14/2012)
- ML13317A709 - Email M. Modes to J. Trapp, RE: Flaw Distributions in the Reactor Vessel. (2 page(s), 11/15/2012)
- ML13317A758 - Email F. Van Wonterghem to A. Thibault et al., RE: Doel 3 & Tihange RPV issue - New Licensee documents. (3 page(s), 11/16/2012)
- ML13317A761 - Email B. Tombuyses to P. Ekstrom et al., RE: Doel 3 & Tihange RPV issue - October 16 th meeting - WG2. (2 page(s), 11/16/2012)
- ML13317A762 - Email F. Van Wonterghem to A. Thibault et al., Subj: Doel 3 & Tihange RPV issue - Comments and questions for WG1. (2 page(s), 11/16/2012)
- ML13317A764 - Email J. Poehler to C. Fairbanks, RE: Monthly meeting with Dan. (3 page(s), 11/20/2012)
- ML13317A765 - Email J. Poehler to S. Rosenberg, RE: Accomplishments, Accomplishments!!! (2 page(s), 12/3/2012)
- ML13317A767 - Email P. Hiland to D. Dorman et al., with Enclosure, Subj: Doel-3 Meeting. (3 page(s), 12/5/2012)
- ML13317A769 - Email C. Nove to G. Stevens et al., FW: Doel 3 - Tihange 2 RPV issue: Safety Case Reports. (3 page(s), 12/6/2012)
- ML13317A770 - Email S. Rosenberg to J. Poehler, RE: Communicating up. (1 page(s), 12/10/2012)
- ML13317A772 - Email A. Artayet to D. Harmon et al., FW: Doel-3. (1 page(s), 12/20/2012)
- ML13317A775 - Doel 3 - Tihange 2 RPV Issue International Expert Review Board Final Report. (17 page(s), 11/1/2013)
- ML13317A809 - Email T. Wells to R. Hardies, RE: Doel 3 PFM Analyses. (1 page(s), 1/4/2013)
- ML13317A811 - Email C. Nove to F. VanWonterghem, et al., Subj: Doel 3 - Tihange 2 RPV issue - feedback on WG1 reports. (1 page(s), 1/6/2013)
- ML13317A812 - Email R. Dyle to R. Hardies, FW: Experts Okay Restart of Worrisome Belgian Nuclear Plants. (2 page(s), 1/7/2013)
- ML13317A814 - Email T. Nazario to A. Issa, RE; Emailing: PER 647214 Latent error in stress analysis for rx vessel core support block. (4 page(s), 1/11/2013)
- ML13317A816 - Email T. Lupold to R. Hardies et al., Subj: Regulatory Information Conference (RIC) 2013- Planning Information. (3 page(s), 1/11/2013)
- ML13317A818 - Email A. Csontos to M. Kirk et al., RE: Post Belgium Mike/Stu Briefing. (1 page(s), 1/11/2013)
- ML13317A819 - Email G. Roussel to R. Hardies et al., Subj: Doel 3 and Tihange 2 RPV issue. (1 page(s), 1/14/2013)
- ML13317A821 - Email C. Latiolais to C. Nove, Subj: Doel. (1 page(s), 1/14/2013)
- ML13317A823 - FANC Press Release, Subj: Doel 3 and Tihange 2: the FANC requests more information from Electrabel. (1 page(s), 1/15/2013)
- ML13317A824 - Email M. Kirk to M. Kirk, et al., Subj: Belgians are cautiously positive on Doel 3 and Tihange 2. (1 page(s), 1/15/2013)
- ML13317A899 - Email A. Issa to T., Le et al., RE; Emailing: PER 647214 Latent error in stress analysis for rx vessel core support block. (5 page(s), 1/16/2013)
- ML13317A900 - Email D. Harmon to S. Freeman et al., RE: Belgians are Cautiously Positive on Doel 3 and Tihange 2. (2 page(s), 11/17/2013)
- ML13317A901 - FANC Press Release, Doel 3 and Tihange 2: the FANC requests more information from Electrabel. (1 page(s), 1/15/2013)
- ML13317A902 - Email G. Roussel to R. Hardies et al., Doel 3 - Tihange 2 RPV issue. (1 page(s), 1/29/2013)
- ML13317A903 - FANC Report: Doel 3 and Tihange 2 Reactor Pressure Vessels - Provisional Evaluation Report. (63 page(s), 1/30/2013)
- ML13317A904 - Email F. Van Wonterghem to A. Thibault et al., Doel 3 & Tihange RPV issue - FANC Provisional Evaluation Report. (3 page(s), 2/1/2013)
- ML13317A905 - FANC: Flaw indications in the Reactor Pressure Vessels of Doel 3 and Tihange 2 - Technical Information Note. (5 page(s), 2/1/2013)
- ML13317A906 - NRC Report Draft, Los Angeles, CA. (20 page(s), 2/28/2013)
- ML13317A907 - Email G. Roussel to R. Hardies et al., Doel 3 - Tihange 2 RPV Issue. (1 page(s), 2/6/2013)
- ML13317A908 - Email T. Lupold to W. Norris, FW: First Draft of Report. (1 page(s), 2/6/2013)
- ML13317A912 - NRC Report. (19 page(s), 2/28/2013)
- ML13317A913 - Email J. Creemers to A. Wertelaers et al., RE: Doel 3 & Tihange RPV: FANC Provisional Evaluation Report. (3 page(s), 2/7/2013)
- ML13317A914 - Email C. Fairbanks to J. Poehler, RE; Doel 3 - Tihange 2 RPV: FANC Provisional Evaluation Report. (3 page(s), 2/12/2013)
- ML13317A915 - Email S. Min to C. Fairbanks et al., Preliminary Comments on the Quasi-laminar Indications. (1 page(s), 2/14/2013)
- ML13317A916 - Email G. Stevens to W. Bamford et al., SGES November Meeting Minutes. (33 page(s), 2/19/2013)
- ML13317A917 - Email J. McGhee to C. Phillips, FW: Doel 3 Tihange 2 RPV Flaws. (1 page(s), 3/11/2013)
- ML13317A918 - Email J. Poehler to T. Griesbach et al., FW: Re-Revision of NRC Report. (1 page(s), 11/1/2012)
- ML13317A919 - Email G. Stevens to R. Hardies et al., FW: Doel 3 - Tihange 2 RPV Issue. (3 page(s), 11/6/2012)
- ML13317A920 - Email G. Stevens to G. Roussel, et al., RE: Doel 3 - Tihange 2 RPV Issue. (4 page(s), 11/6/2013)
- ML13317A921 - Email G. Stevens to G. Roussel, RE: Doel 3 - Tihange 2 RPV Issue. (2 page(s), 11/7/2012)
- ML13317A936 - Email G. Stevens to R. Tregoing et al., FW: Doel 3 - Tihange 2 RPV Issue. (5 page(s), 11/7/2012)
- ML13317A937 - Email R. Hardies, NRR to J. Poehler, NRR RE: the Doel 3 Indications Presentations for ET LT. (1 page(s), 11/4/2012)
- ML13317A938 - Email G. Stevens to R. Hardies, FW: Request for PTS Time Histories. (1 page(s), 11/8/2013)
- ML13317A939 - Email J. Poehler to S. Rosenberg et al., RE; Doel 3 Update. (2 page(s), 11/9/2012)
- ML13317A940 - Email J. Poehler to S. Rosenberg et al., RE: Doel 3 Update. (2 page(s), 11/9/2012)
- ML13317A941 - Email G. Stevens to R. Tregoning, ASME Code Meeting Report - Subgroup on Evaluation Standards. (8 page(s), 11/12/2013)
- ML13317A942 - Email P. Hiland, NRR to R. Hardies, NRR RE: Response - Trip Report for Travel to Brussel, Belgium October 13-18, 2012, to Discuss Indications at Doel 3. (2 page(s), 11/13/2013)
- ML13317A943 - Meeting Slides on Indications in Reactor Pressure Vessel Forgings NRR/DE Management Briefing. (11 page(s), 11/13/2012)
- ML13317A944 - Email L. Streibig, ASN to R. Hardies, NRR RE: BMI Penetration Degradation in France. (2 page(s), 11/13/2012)
- ML13317A945 - Email D. Merzke, EDO to R. Hardies, NRR RE: Response - Trip report for travel to Brussels, Belgium October 13-18, 2012, to Discuss Indications at Doel-3. (3 page(s), 11/14/2013)
- ML13317A955 - Email from B. Tombuyses, FANC to P. Ekstrom, et al., on Doel 3 & Tihange 2 RPV Issue - October 1 6th Meeting - WG2. (14 page(s), 11/14/2012)
- ML13317A956 - Email G. Stevens to C. Nove et al., RE: Doel 3 & Tihange 2 RPV issue - October 16 th meeting - WG1: Non-Destructive Examination Techniques Meeting Report. (2 page(s), 11/14/2012)
- ML13317A958 - Email G. Stevens to C. Nove et al., re: Doel 3 NDE info and WG# Info. (1 page(s), 11/14/2012)
- ML13317A959 - Email G. Stevens, RES to R. Hardies, NRR re: Talking Point for Leeds on Doel for ASN. (1 page(s), 11/15/2012)
- ML13317A960 - Email P. Hiland, NRR to R. Hardies, NRR RE: Talking Point for Leeds on Doel for ASN. (4 page(s), 11/15/2012)
- ML13317A961 - Email G. Stevens to C. Nove et al., re: Meeting with Guy Roussel (Bel V) to Discuss RPV Issues. (2 page(s), 11/15/2012)
- ML13317A962 - Email G. Stevens to A. Csontos et al., Subj: Bel V Meeting Summary. (4 page(s), 11/19/2012)
- ML13317A963 - Email S. Rosenberg to C. Fairbanks et al., FW: Doel 3 Updates. (3 page(s), 11/20/2012)
- ML13317A964 - Email J. Hopkins, NRR to R. Hardies, NRR FW: MDEP-CSWG-10th meeting Draft Summary Record-Information on Doel event. (7 page(s), 11/26/2012)
- ML13317A965 - Email G. Roussel to G. Stevens et al., Subj: Doel 3- Tihange 2 RPV Issue-WG3-Justification file. (13 page(s), 11/30/2012)
- ML13317A972 - Email G. Stevens to M. Kirk et al., FW: Minutes of the Meeting of October 16th, 2012. (2 page(s), 11/30/2012)
- ML13317A973 - Email M. Kirk to G. Stevens et al., Subj: Very Informal Belgium Trip Report. (3 page(s), 11/30/2012)
- ML13317A974 - Email G. Stevens to M. Kirk et al., FW: Doel 3 - Tihange 2 RPV Issue - WG3 - Justification file. (2 page(s), 11/30/2012)
- ML13317A975 - Email J. Poehler, NRR to G. Stevens, RES RE: Doel 3-tihange 2 RPV Issue-wg3-justification file. (3 page(s), 12/3/2012)
- ML13317A976 - Email M. Dennis, EPRI to C. Nove, RES et al., RE: Public Meeting Schedule Regarding the Recent Doe 3 OE. (1 page(s), 12/4/2012)
- ML13317A977 - Email R. Dyle, EPRI to R. Hardies, NRR FW: Doel 3 follow-up. (1 page(s), 12/5/2012)
- ML13317A978 - Email F. Van Wonterghem, FANC to A. Thibault, ASN et al., on Doel 3- Tihange 2 RPV Issue; Licensee Documents & Next meeting 8 & 9 January 2013. (5 page(s), 12/5/2012)
- ML13317A979 - Email S. Rosenberg, NRR to C. Fairbanks et al., NRR RE: Bilateral with France. (4 page(s), 12/5/2012)
- ML13317A980 - Email C. Fairbanks, NRR to S. Rosenbergy et al., NRR RE: Bilateral with France. (4 page(s), 12/5/2012)
- ML13317A981 - Email R. Dyle EPRI to R. Hardies, NRR RE: Postponing Jan 8 Doel Meeting. (1 page(s), 12/5/2012)
- ML13317A986 - Email C. Nove, RES to R. Hardies, NRR RE: Final FANC Meeting Jan 8-9, Postponing Public Meeting Jan 8. (2 page(s), 12/5/2012)
- ML13317A987 - Email M. Kirk to J. Poehler et al., RE: Doel 3-Tihange 2 RPV Issue: Licensee Documents & Next Meeting: 8 & 9 January 2013. (3 page(s), 12/5/2012)
- ML13317A988 - Email N. Carol to Stevens G et al., RE: Doel 3-Tihange 2 RPV Issue - WG3. (3 page(s), 12/5/2012)
- ML13317A989 - Email A. Csontos to J. Poehler et al., RE: Doel 3 - Tihange 2 RPV Issue: Licensee Documents & Next Meeting: 8 & 9 January 2013. (3 page(s), 12/5/2012)
- ML13317A990 - Email A. Csontos to M. Kirk et al., RE: Doel 3-Tihange 2 RPV Issue: Licensee documents & Next Meeting: 8 & 9 January 2013. (5 page(s), 12/5/2012)
- ML13317A991 - Email M. Kirk to J. Ramsey et al., Subj: 1 more Meeting Requested Concerning Doel. (2 page(s), 12/6/2012)
- ML13317A992 - Email G. Stevens, RES to R. Hardies, NRR et al., RE: Doel 3-Tihange 2 RPV Issue-WG3-justification file. (2 page(s), 12/11/2012)
- ML13317A993 - Email G. Stevens, RES to R. Hardies, NRR et al., FW: Doel 3-Tihange 2 RPV Issue-WG3-Justification File. (7 page(s), 12/17/2012)
- ML13317A994 - Email G. Stevens to N. Dasseville et al., RE: Doel 3 - Tihange 2 RPV Issue: Licensee Documents & Next Meeting 8 & 9 January 2013. (2 page(s), 12/17/2012)
- ML13317A995 - Email A. Csontos to S. Rosenberg et. al., Subj: RES Doel Work & PTS RG NUREG Tech Basis. (1 page(s), 12/17/2012)
- ML13317B002 - Email G. Stevens to G. Roussel et al., RE: Doel 3-Tihange 2 RPV Issue: Licensee Documents & Next Meeting: 8 & 9 January 2013. (3 page(s), 12/18/2012)
- ML13317B003 - Email J. Poehler, NRR to R. Hardies, NRR et al., RE: Doel 3 - Tihange 2 RPV issue - WG3 - justification file. (4 page(s), 12/18/2012)
- ML13317B004 - Email J. Poehler, NRR to B. Tombuyses, FANC et al., RE: Doel 3 & Tihange 2 RPV issue - WG2 - Laborelec notes. (4 page(s), 12/18/2012)
- ML13317B005 - Email J. Poehler, NRR to B. Tombuyses, FANC et al., RE: Doel 3 & Tihange 2 RPV issue - WG2 - Laborelec notes. (3 page(s), 12/18/2012)
- ML13317B006 - Email M. Kirk to A. Csontos et al., Subj: Information from Belgium re Doel. (2 page(s), 12/18/2012)
- ML13317B007 - Email J. Poehler, NRR to B. Tombuyses, FANC., RE: Doel 3 & Tihange 2 RPV issue - WG2 - Laborelec notes. (4 page(s), 12/19/2012)
- ML13317B008 - Email R. Hardies, NRR to C. Nove, RES et al., FW; Chairman briefing on Doel 3. (2 page(s), 12/19/2012)
- ML13317B009 - Email C. Nove, RES to R. Hardies, NRR et al., RE: your per-trip notification. (2 page(s), 12/20/2012)
- ML13317B010 - Email R. Hardies, NRR to G. Stevens, RES et al., RE: Doel 3 plans and proposed actions. (3 page(s), 12/20/2012)
- ML13317B011 - Email C. Nove, RES to R. Hardies, NRR RE: Doel 3 plans and proposed actions. (2 page(s), 12/20/2012)
- ML13317B052 - Email J. Poehler, NRR to G. Stevens, RES RE: Doel 3 plans and proposed actions. (3 page(s), 12/20/2012)
- ML13317B053 - Email R. Hardies to C. Fairbanks et al., Subj:-Doel 3 plans and proposed actions with Enclosures. (22 page(s), 12/20/2012)
- ML13317B056 - Email A. Csontos to R. Hardies, RE: Doel 3 plans and proposed actions. (3 page(s), 12/20/2012)
- ML13317B057 - Email A. Csontos to R. Hardies, RE: Doel 3 plans and proposed actions. (2 page(s), 12/20/2012)
- ML13317B059 - Email M. Kirk to R. Hardies, RE: Doel 3 plans and proposed actions. (3 page(s), 12/20/2012)
- ML13317B061 - Email B. Brickstad, SSM to G. Roussel, Belgium et al., on My comments and questions on the safety case of defects in Doel -3. (3 page(s), 12/21/2012)
- ML13317B062 - Email A. Csontos to M. Case, et al., RE: Carol Doel Trip. (1 page(s), 12/21/2012)
- ML13317B064 - Email G. Stevens to J. Poehler, RE: My comments and questions on the safety case of defects in Doel-3. (3 page(s), 12/21/2012)
- ML13317B067 - Email Kanno-Masanori, JNES to B. Tombuyes, FANC et al., on Comments to Safety Case Report of Doel 3 RPV Issue. (4 page(s), 12/29/2012)
- ML13317B068 - Email F. Van Wonterghem, FANC to A. Thibault, ASN et al., on Doel 3 - Tihange 2 RPV Issue: Detailed agenda for meeting of 8&9 January 2013. (3 page(s), 1/2/2013)
- ML13317B117 - Email G. Stevens to L. Lindhorst, RE: My comments and questions on the safety case of defects in Doel-3. (7 page(s), 1/2/2013)
- ML13317B118 - Email G. Stevens to A. Csontos et al., FW: My comments and questions on the safety case of defects in Doel-3. (7 page(s), 1/2/2013)
- ML13317B119 - Email A. Csontos to C. Nove et al., RE: Development of NRC Staff Consensus Approach following Doel/Tihange Discoveries. (5 page(s), 1/3/2013)
- ML13317B120 - Email M. Kirk to R. Hardies RE: Suggested agenda for NRC Staff meeting on Doel, 11 or 1.4 January. (5 page(s), 1/3/2013)
- ML13317B121 - Email H. Kunio, JNES to B. Brickstad, Belgium et al., RE: My comments and questions on the safety case of defects in Doel 3. (3 page(s), 1/4/2013)
- ML13317B122 - Email F. Van Wonterghem to R. Hardies, RE: Doel 3 - Tihange 2 RPV issue: Meeting of 8&9 January 2013: Change of Location. (3 page(s), 1/4/2013)
- ML13317B124 - Email A. Csontos to M. Case et al., FW: My comments and questions on the safety case of defects in Doel-3. (4 page(s), 1/4/2013)
- ML13317B125 - Email C. Nove to M. Kirk et al., Subj: CAN Comments on NDE Reports. (8 page(s), 1/4/2013)
- ML13317B126 - Email R. Hardies, NRR to G. Stevens, RES et al., FW: Doel 3 - Tihange 2 RPV issue - WG3 justification file. (4 page(s), 1/6/2013)
- ML13317B127 - Email G. Roussel, Belgium to R. Hardies, NRR RE: Doel 3 - Tihange 2 RPV issue - WG3 - justification file. (4 page(s), 1/7/2013)
- ML13317B167 - Email M. Sotelino, State to R. Hardies, NRR RE: Visit to Brussels Jan 7-10. (4 page(s), 1/7/2013)
- ML13317B168 - Email S. Crombez, ASN to R. Hardies, NRR RE: Doel 3 - Tihange 2 RPV issue - WG3 - justification file. (5 page(s), 1/7/2013)
- ML13317B169 - Email G. Stevens to K. Hasegawa et al., RE: My comments and questions on the safety case of defects in Doel-3. (4 page(s), 1/7/2013)
- ML13317B170 - Email J. Poehler to P. Hiland, RE: Action Plan on Doel. (2 page(s), 1/7/2013)
- ML13317B171 - Email J. Poehler to C. Nove, RE: CAN Comments on NDE Reports. (1 page(s), 1/7/2013)
- ML13317B173 - Email N. Sanfilippo to R. Hardies, RE: Doel. (1 page(s), 1/8/2013)
- ML13317B174 - Email C. Fairbanks, NRR to M. Kirk, RES et al., RE: Development of NRC Staff Consensus Approach following Doel/Tihange Discoveries. (3 page(s), 1/11/2013)
- ML13317B176 - Email C. Nove to S. Richards et al., FW: Brief summary of the discussions with FANC this week to discuss Doel. (2 page(s), 1/11/2013)
- ML13317B177 - Email M. Kirk to R. Hardies et al., RE: Brief summary of the discussions with FANC this week to discuss Doel. (2 page(s), 1/11/2013)
- ML13317B179 - Email M. Kirk to M. Kirk et al., RE: Development of NRC Staff Consensus Approach following Doel/Tihange Discoveries. (5 page(s), 1/11/2013)
- ML13317B233 - Email T. Griesbach to D. Lamond et al., RE: URGENT - Need help this weekend!!!! RE: P.004315-RPV Project for Tractebel-Doel 3 Review.' (4 page(s), 1/13/2013)
- ML13317B235 - Email M. Auglaire to D. Lamond et al., RE: URGENT- Need help this weekend!!!!! RE: p.004315-RPV Project for Tractebel-Doel 3 Review. (3 page(s), 1/13/2013)
- ML13317B237 - Email T. Griesbach to D. Lamond et al., FW: URGENT - Need help this weekend!!!!! RE: p.004315-RPV Project for Tractebel-Doel 3 Review. (6 page(s), 1/13/2013)
- ML13317B239 - Email P. Hiland, NRR to R. Hardies, NRR FW: Brief summary of the discussions with FANC this week to discuss Doel. (2 page(s), 1/14/2013)
- ML13317B241 - Email M. Kirk to M. Kirk et al., RE: Development of NRC Staff Consensus Approach following Doel/Tihange Discoveries. (7 page(s), 1/14/2013)
- ML13317B242 - Email M. Kirk to M. Kirk et al., RE: Development of NRC Staff Consensus Approach following Doel/Tihange Discoveries. (3 page(s), 1/14/2013)
- ML13317B243 - Email G. Stevens to M. Kirk et al., RE: Development of NRC Staff Consensus Approach following Doel/Tihange Discoveries. (4 page(s), 1/14/2013)
- ML13317B244 - Email C. Nove to R. Hardies et al., Subj: C Nove summary of Jan 2013 meeting at FANC + path forward thoughts. (6 page(s), 1/14/2013)
- ML13317B245 - Email G. Stevens to C. Nove et al., FW: Doel 3 and Tihange 2 RPV issue. (1 page(s), 1/14/2013)
- ML13317B247 - Email J. Poehler, NRR to C. Nove, RES RE: Doel 3 Sharepoint Site. (1 page(s), 1/15/2013)
- ML13317B290 - Email J. Poehler, NRR to G. Stevens, RES RE: Doel 3 Sharepoint Site. (1 page(s), 1/15/2013)
- ML13317B292 - Email L. Streibig to R. Hardies, RE: Meeting about Doel 3. (1 page(s), 1/15/2013)
- ML13317B293 - Email J. Poehler to C. Fairbanks, Subj: Sulfur and Hydrogen. (1 page(s), 1/15/2013)
- ML13317B295 - Email C. Fairbanks, NRR to J. Poehler, NRR RE: Strawman Information Request List and Screening Criteria. (1 page(s), 1/16/2013)
- ML13317B297 - Committee Correspondence on Agenda for February 12, 2013, Meeting and Minutes from November 6, 2012, Meeting. (20 page(s), 1/16/2013)
- ML13317B299 - Email J. Poehler to S. Rosenberg et al., FW: WG OPC November 2012 Meeting Minutes and February 2013 Meeting Agenda. (2 page(s), 1/17/2013)
- ML13317B338 - Email C. Nove, RES to R. Hardies, NRR et al., FW: Belgium trip report with Mark's comments. (4 page(s), 1/18/2013)
- ML13317B300 - Email M. Kirk, RES to C. Nove, RES et al., on explanation of laminar cracks en Francais. (1 page(s), 1/18/2013)
- ML13317B302 - Email C. Nove to A. Weyn, FW: Doel Indications. (2 page(s), 1/18/2013)
- ML13317B303 - Email J. Poehler to B. Vaidya, Subj: FW NMP1 Relief Requese SE. (2 page(s), 1/22/2013)
- ML13317B340 - Email M. Kirk to R. Hardies et al., Subj: Recent Doel International Review Board (IRB) activity. (14 page(s), 1/23/2013)
- ML13317B341 - Email R. Dyle to R. Hardies, FW: Conference call on Doel Work Being Performed by Industry - Call-in Number Added. (2 page(s), 1/23/2013)
- ML13317B343 - Email M. Kirk, RES to C. Fairbanks, NRR et al., on March 5 Public Meeting. (1 page(s), 1/28/2013)
- ML13317B344 - Email G. Stevens to C. Nove et al., RE: Doel 3 - Tihange 2 RPV Issue with Enclosure. (42 page(s), 1/29/2013)
- ML13317B345 - Email G. Stevens to M. Kirk et al., Subj: New Report from Belgium. (1 page(s), 1/29/2013)
- ML13317B347 - Email G. Stevens to C. Fairbanks et al., RE: Doel 3 - Tihange 2 RPV Issue. (2 page(s), 1/30/2013)
- ML13317B348 - Email M. Kirk to C. Fairbanks et al., FW: Draft QL Flaw User Need - Sent to NRR-NRO for Comment. (7 page(s), 1/30/2013)
- ML13317B349 - Email G. Roussel to M. Kirk et al., RE: Doel 3 - Tihange 2 RPV Issue. (2 page(s), 1/30/2013)
- ML13317B350 - Email J. Poehler, NRR to S. Min, NRR RE: RE: Sizes of the Defect Indications (Doel 3). (1 page(s), 2/1/2013)
- ML13317B351 - Email M. Kirk, RES to R. Hardies, NRR Re: NRC Program for h2 Flaking. (1 page(s), 2/1/2013)
- ML13317B379 - Email J. Poehler, NRR to S. Min, NRR RE: Sizes of the Defect Indications (Doel 3). (1 page(s), 2/4/2013)
- ML13317B380 - Email C. Nove to G. Stevens, R. Hardies, FW: March 5th Public Meeting on Hydrogen Flaking - Draft Meeting Announcement. (2 page(s), 2/4/2013)
- ML13317B381 - Email M. Kirk to B. Yip RE: Belgium: FANC's Doel/Tihange Restart Requirements. (1 page(s), 2/5/2013)
- ML13317B382 - Email G. Stevens to G. Roussel, RE: Doel 3 - Tihange 2 RPV Issue. (2 page(s), 2/6/2013)
- ML13317B383 - Email G. Stevens to C. Fairbanks et al., FW: Doel 3 - Tihange 2 RPV Issue. (1 page(s), 2/6/2013)
- ML13317B384 - Email C. Breskovic to C. Breskovic with Enclosure, Subj: GNOSIS News 2013-02-07. (2 page(s), 2/7/2013)
- ML13317B385 - Email J. Poehler, NRR to S. Min,NRR et al., RE: Hydrogen Sources. (1 page(s), 2/7/2013)
- ML13317B386 - Email S. Min, NRR to J. Poehler, NRR et al., RE: Hydrogen Sources. (2 page(s), 2/7/2013)
- ML13317B387 - Email M. Kirk to B. Yip et al., RE: OIP Note Dated February 6, 2013 - Belgian Federal Agency for Nuclear Control, with Enclosure. (8 page(s), 2/7/2013)
- ML13317B388 - Email G. Stevens to W. Norris et al., RE: First Draft of Report. (1 page(s), 2/7/2013)
- ML13317B418 - Email K. Masanori, JNES to R. Hardies, NRR RE: On Issue of Doel 3 & Tihange2 RPV. (2 page(s), 2/12/2013)
- ML13317B419 - Email S. Stuchell, NRR to R. Hardies, NRR RE: Doel Meeting. (3 page(s), 2/12/2013)
- ML13317B420 - Email R. Dyle to M. Kirk et al., RE: Doel 3 - Tihange 2 RPV Issue: FANC Provisional Evaluation Report. (5 page(s), 2/12/2013)
- ML13317B421 - Email M. Kirk, RES to R. Hardies, NRR et al., Re: Quasi-laminar Crack Meeting Next Tuesday Afternoon. (2 page(s), 2/15/2013)
- ML13317B423 - Email C. Fairbanks, NRR to M. Kirk, RES et al., RE: NRC Actions on Quasi-Laminar Flaws. (4 page(s), 2/19/2013)
- ML13317B424 - 02/19/2013 Meeting Notice on NRC Actions on Quasi-Laminar Flaws. (8 page(s), 2/19/2013)
- ML13317B425 - Email G. Stevens to ASME Code Participants; RES_DE_CIB; R. Tregoning; RES_DE_CMB, Subj: ASME Code Meeting Report - Subgroup on Evaluation Standards. (7 page(s), 2/19/2013)
- ML13317B427 - Email G. Stevens to C. Fairbanks et al., RE: NRC Actions on Quasi-Laminar Flaws. (4 page(s), 2/19/2013)
- ML13317B428 - Email M. Kirk to C. Fairbanks et al., RE: NRC Actions on Quasi- Laminar Flaws. (3 page(s), 2/19/2013)
- ML13317B429 - Email M. Kirk to C. Fairbanks et al., RE: NRC Actions on Quasi- Laminar Flaws. (1 page(s), 2/19/2013)
- ML13317B430 - Email N. Perry to L. Pinkham, D. Schroeder, FW: IOEB Clearinghouse Screening Summary for Thursday, August 2, 2012. (4 page(s), 4/26/2013)