NRC Logo

Home > NRC Library > ADAMS Public Documents

Responds to IE Bulletin 83-03 re testing of check valves in diesel generator cooling water sys.Four check valves will be included in inservice testing program.W/two oversize drawings.Aperture cards are available in PDR.

Accession Number: ML13310A795

Date Released: Sunday, November 8, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer