NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards turbine trip test results showing plant dynamic response per design requirements following 830616 turbine trip.Approval requested for proposed FSAR mod re power ascension testing sequence to support startup testing.

Accession Number: ML13309B290

Date Released: Tuesday, December 31, 2013

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer