Home > NRC Library > ADAMS Public Documents
NFPA-805 Octobe 25-2013 Public Meeting.
Accession Number: ML13297A467
Date Released: Tuesday, October 29, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13297A477 - 1 NRC NFPA 805 Presentation 10-25-13. (20 page(s), 10/25/2013)
- ML13297A483 - 2 NFPA 805 Lessons Learned. (6 page(s), 10/25/2013)
- ML13297A488 - 3 LAR Efficiency and Cost Saving Improvements. (11 page(s), 10/25/2013)
- ML13297A496 - 4 Piloting Process Improvements. (12 page(s), 10/25/2013)
- ML13297A498 - 5 Compensatory Measure Implementation Throughout Transition. (4 page(s), 10/25/2013)
- ML13302B288 - 6 Transition Implementation (post LAR). (10 page(s), 10/25/2013)
- ML13302B321 - 7 Communication on Review Schedule Changes. (8 page(s), 10/25/2013)
- ML13302B465 - 8 FPRA Issue Status. (7 page(s), 10/25/2013)
- ML13302B557 - 9 Finalizing Licensing-Basis Information for NFPA 805 PRA Freeze Point. (14 page(s), 10/25/2013)
- ML13302B572 - 10 PRA Technical Adequacy vs Requirements of Risk-Informed Programs. (7 page(s), 10/25/2013)
- ML13302B870 - NFPA 805 Path Forward and Action Items, Meeting Attendees. (6 page(s), 10/25/2013)