Home > NRC Library > ADAMS Public Documents
Submittal of Setpoint Calculations, Setpoint Methodology, and Justification for Application of Technical Specification Changes in WCAP-14333 and WCAP-1 5376 Documents for the License Amendment Request for Digital Process Protection System Replacement.
Accession Number: ML13267A127
Date Released: Wednesday, October 2, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13267A129 - Submittal of Setpoint Calculations, Setpoint Methodology, and Justification for Application of Technical Specification Changes in WCAP-14333 and WCAP-15376 Documents for the License Amendment Request for Digital Process Protection System Replacement. (10 page(s), 3/7/2013)
- ML13267A130 - Attachment 1 to DCL-13-016 - Westinghouse Authorization Letter, CAW-13-3598. (9 page(s), 1/30/2013)
- ML13267A131 - Attachment 2 to DCL-13-016 - Westinghouse Authorization Letter, CAW-13-3599. (8 page(s), 1/30/2013)
- ML13267A132 - Attachment 3 to DCL-13-016 - Westinghouse Authorization Letter, CAW-13-3596. (9 page(s), 1/28/2013)
- ML13267A133 - Attachment 4 to DCL-13-016, WCAP-17696-NP, Revision 0, "Westinghouse Setpoint Calculations for the Diablo Canyon Power Plant Digital Replacement Process Protection System." (109 page(s), 1/31/2013)
- ML13267A134 - Attachment 5 to DCL-13-016 - WCAP-17706-NP, Revision 0, "Westinghouse Setpoint Methodology as Applied to the Diablo Canyon Power Plant." (54 page(s), 1/31/2013)
- ML13267A135 - Attachment 6 to DCL-13-016, LTR-RAM-1-13-002 NP-Attachment, Revision 0, "Justification for the Application of Technical Specifications Changes in WCAP-14333 and WCAP-15376 to the Tricon/ALS Process Protection System at the Diablo Canyon Power Plant." (58 page(s), 1/31/2013)