Crow Butte Resources - Marsland Expansion Area License Amendment Application Revisions dated August 1, 2013.
Accession Number: ML13233A074
Date Released: Wednesday, August 21, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13232A379 - Marsland Revised Technical Report, August 1, 2013, Cover Email - Crow Butte Resources - Marsland Expansion Area License Amendment Application Revisions dated 6/26/13. (1 page(s), 8/1/2013)
- ML13234A424 - Marsland Revised Technical Report, August 1, 2013, Appendix A - Water User Survey Info for Water Supply Wells in 2.2-Mile Area of Review. (6 page(s), 8/1/2013)
- ML13232A380 - Marsland Revised Technical Report, August 1, 2013, Appendix J - Analytical Summary Report. (1020 page(s), 8/1/2013)
- ML13232A381 - Marsland Revised Technical Report, August 1, 2013, Appendix K1 - Cameco - Hydrologic and Erosion Study Marsland Expansion Area. (57 page(s), 8/1/2013)
- ML13232A382 - Marsland Revised Technical Report, August 1, 2013, Appendix K2 - Cameco - Hydrologic and Flood Study Marsland Expansion Area. (78 page(s), 8/1/2013)
- ML13232A383 - Marsland Revised Technical Report, August 1, 2013, Appendix P - Cost Estimate for Decontamination., Decommissioning and Reclamation of Proposed Marsland Expansion Area (One Mine Unit). (26 page(s), 8/1/2013)
- ML13232A384 - Marsland Revised Technical Report, August 1, 2013, Appendix R - Siting of Meteorological Instruments. (3 page(s), 8/1/2013)
- ML13232A385 - Marsland Revised Technical Report, August 1, 2013, Appendix S - Justification for Use of 15 Years of Scottsbluff's Meteorological Data. (11 page(s), 8/1/2013)
- ML13232A386 - Marsland Revised Technical Report, August 1, 2013, Appendix T - Marsland Water Balance (Production, Restoration, and Stabilization Sampling). (2 page(s), 8/1/2013)
- ML13232A387 - Marsland Revised Technical Report, August 1, 2013, Table 2.2-8 Uranium Recovery Activities in Region of Proposed Marsland Expansion Area Through Table 10.1-2 Environmental Approvals for Proposed Marsland Expansion Area. (129 page(s), 8/1/2013)
- ML13232A377 - Marsland Revised Technical Report, August 1, 2013, Figure 1.7-1, "Current Production Area Mine Unit Timeline" Through Figure 6.1-1, "Restoration Process Flow Diagram". (22 page(s), 8/1/2013)
- ML13232A378 - Revised Nuclear Regulatory Commission Technical Report, Vol. I, Marsland Expansion Area, August 1, 2013. (920 page(s), 8/1/2013)