Home > NRC Library > ADAMS Public Documents
Vogtle Electric Generating Plant, Units 3 & 4, Updated Final Safety Analysis Report and Tier 1 (Public Version).
Accession Number: ML13205A347
Date Released: Monday, July 29, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13205A266 - Vogtle Electric Generating Plant, Units 3 & 4, Updated Final Safety Analysis Report and Tier 1 (Public Version). (3 page(s), 7/3/2013)
- ML13205A267 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 1 - Tier 1 Public Version. (559 page(s), 7/3/2013)
- ML13205A268 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 1, Introduction and General Description of the Plant. (448 page(s), 7/3/2013)
- ML13205A273 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 2, Table of Content. (22 page(s), 7/3/2013)
- ML13205A274 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 2, Site Characteristics. (23 page(s), 7/3/2013)
- ML13205A275 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 2, Section 2.1 - Geography and Demography. (23 page(s), 7/3/2013)
- ML13205A276 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 2, Section 2.2 - Identification of Potential Hazards in Site Vicinity. (32 page(s), 7/3/2013)
- ML13205A277 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 2, Section 2.3 - Meteorology. (124 page(s), 7/3/2013)
- ML13205A272 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 2, Appendix 2.4A - Observation Well Installation and Development Report. (231 page(s), 7/3/2013)
- ML13205A278 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 2, Appendix 2.4B - Groundwater Model Development & Analysis. (141 page(s), 7/3/2013)
- ML13205A279 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 2, Section 2.5, Geology, Seismology, and Geotechnical Engineering. (473 page(s), 7/3/2013)
- ML13205A287 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 2, Appendix 2.5A - Geotechnical Investigation and Laboratory Testing Data Report - ESP. (1 page(s), 7/3/2013)
- ML13205A288 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 2, Appendix 2.5B - High Resolution Compressional Siesmic Servey Field Report. (1 page(s), 7/3/2013)
- ML13205A284 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 2, Appendix 2.5C - Geotechnical Investigation and Liboratory Testing Data Report - COL. (1 page(s), 7/3/2013)
- ML13205A285 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 2, Appendix 2.5D - Engineered Fill Below Grade Test Pad, Phase 1. (1 page(s), 7/3/2013)
- ML13205A286 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 2, Appendix 2.5E - AP1000 Vogtle Site Specific Seismic Evaluation Report. (93 page(s), 7/3/2013)
- ML13206A025 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Table of Contents. (26 page(s), 7/3/2013)
- ML13206A026 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Design of Structures, Components, Equipment and Systems, Section 3.1 - Conformance with Nuclear Regulatory Commission General Design Criteria. (29 page(s), 7/3/2013)
- ML13206A027 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Section 3.2 - Classification of Structures, Components, and Systems. (94 page(s), 7/3/2013)
- ML13206A028 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Section 3.3 - Wind and Tornado Loadings. (6 page(s), 7/3/2013)
- ML13206A029 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Section 3.4 - Water Level (Flood) Design. (24 page(s), 7/3/2013)
- ML13206A022 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Section 3.5, Missile Protection. (20 page(s), 7/3/2013)
- ML13206A023 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Section 3.6, Protection Against the Dynamic Effects Associated with the Postulated Rupture of Piping. (50 page(s), 7/3/2013)
- ML13206A024 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Section 3.7, Seismic Design. (110 page(s), 7/3/2013)
- ML13206A030 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Section 3.8, Design of Category 1 Structures. (185 page(s), 7/3/2013)
- ML13206A031 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Section 3.9, Mechanical Systems and Components. (161 page(s), 7/3/2013)
- ML13206A032 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Section 3.10, Seismic and Dynamic Qualification of Seismic Category I Mechanical and Electrical Equipment. (7 page(s), 7/3/2013)
- ML13206A055 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Section 3.11, Environmental Qualification of Mechanical and Electrical Equipment. (57 page(s), 7/3/2013)
- ML13206A056 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Appendix 3A, HVAC Ducts and Duct Supports. (3 page(s), 7/3/2013)
- ML13206A057 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Appendix 3B, Leak-Before-Break Evaluation of the AP1000 Piping. (40 page(s), 7/3/2013)
- ML13206A058 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Appendix 3C, Reactor Coolant Loop Analysis Methods. (4 page(s), 7/3/2013)
- ML13206A051 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Appendix 3D, Methodology for Qualifying AP1000 Safety-Related. (107 page(s), 7/3/2013)
- ML13206A052 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Appendix 3E, High-Energy Piping in the Nuclear Island. (10 page(s), 7/3/2013)
- ML13206A053 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Appendix 3F, Cable Trays and Cable Tray Supports. (3 page(s), 7/3/2013)
- ML13206A054 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Appendix 3G, Nuclear Island Seismic Analyses. (75 page(s), 7/3/2013)
- ML13206A059 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Appendix 3GG, 3-D SSI Analysis of AP1000 at Vogtle Site Using NI15 Model. (35 page(s), 7/3/2013)
- ML13206A060 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Appendix 3H, Auxiliary and Shield Building Critical Sections. (78 page(s), 7/3/2013)
- ML13206A061 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 3, Appendix 3I, Evaluation for High Frequency Seismic Input. (72 page(s), 7/3/2013)
- ML13206A133 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 4, Reactor. (192 page(s), 7/3/2013)
- ML13206A134 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 5, Reactor Coolant System and Connected Systems. (196 page(s), 7/3/2013)
- ML13206A135 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 6, Engineered Safety Features. (273 page(s), 7/3/2013)
- ML13206A136 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 7, Instrumentation and Controls. (185 page(s), 7/3/2013)
- ML13206A137 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 8, Electric Power. (90 page(s), 7/3/2013)
- ML13206A138 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 9, Auxiliary Systems. (581 page(s), 7/3/2013)
- ML13206A139 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 10, Steam and Power Conversion. (139 page(s), 7/3/2013)
- ML13206A140 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 11, Radioactive Waste Management. (179 page(s), 7/3/2013)
- ML13206A141 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 12, Radiation Protection. (197 page(s), 7/3/2013)
- ML13206A143 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 13, Conduct of Operation. (164 page(s), 7/3/2013)
- ML13206A144 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 14, Initial Test Program. (194 page(s), 7/3/2013)
- ML13206A145 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 15, Accident Analyses. (639 page(s), 7/3/2013)
- ML13206A146 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 16, Technical Specifications. (8 page(s), 7/3/2013)
- ML13206A148 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 17, Quality Assurance. (36 page(s), 7/3/2013)
- ML13206A149 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 18, Human Factors Engineering. (82 page(s), 7/3/2013)
- ML13206A152 - Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 19, Probabilistic Risk Assessment. (390 page(s), 7/3/2013)