Home > NRC Library > ADAMS Public Documents
Quad Cities Nuclear Power Station: License Amendment Request - Use of Neutron Absorbing Inserts in Units 1 and 2 Spent Fuel Pool Storage Racks.
Accession Number: ML13199A032
Date Released: Friday, July 26, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13199A037 - Quad Cities Nuclear Power Station: License Amendment Request - Use of Neutron Absorbing Inserts in Units 1 and 2 Spent Fuel Pool Storage Racks. (49 page(s), 7/16/2013)
- ML13199A038 - Attachment 5 - Holtec International Report No. HI-2125245, Revision 2, "Licensing Report for Quad Cities Criticality Analysis for Inserts - Non Proprietary Version". (136 page(s), 7/16/2013)
- ML13199A039 - Attachment 8 - NETCO Report NET-259-03, Revision 5, "Material Qualification of Alcan Composite for Spent Fuel Storage". (77 page(s), 7/30/2009)
- ML13199A040 - Attachment 10 - NETCO Report NET-332-01, Revision 1, "Inspection and Testing of BORALĀ® and Fast Start Surveillance Coupons from the LaSalle County Units 1 & 2 Stations". (64 page(s), 9/10/2009)
- ML13199A041 - Attachment 11 - NETCO Report NET-300054-01, Revision 0, "Inspection and Testing of Fast Start Surveillance Coupons F22-F1 1 from the LaSalle County Unit 2 Station". (37 page(s), 1/17/2013)