Home > Site Help > Search Results

Peach Bottom Station - License Amendment Request - Increase the Safety Relief Valve/Safety Valve Lift Setpoint Tolerance, the Required Number of Operable Safety Relief Valves/Safety Valves, and the Standby Liquid Control System Discharge Pressure Value.

Accession Number: ML131750144

Date Released: Tuesday, July 2, 2013

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer