Home > NRC Library > ADAMS Public Documents
FY14(12/13) - 50423 Millstone, Unit 3, Initial OL Exam (Fac Dev) (U01874).
Accession Number: ML13164A263
Date Released: Thursday, April 21, 2016
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13213A321 - Senior Reactor and Reactor Operator Initial License Examinations Millstone Unit 3. (4 page(s), 8/1/2013)
- ML13331A064 - Initial Operator Licensing Operating Test and Written Exam Approval Millstone 3. (3 page(s), 11/26/2013)
- ML14010A034 - Millstone, Unit 3 - NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2). (6 page(s), 9/11/2013)
- ML14010A035 - Millstone Unit 3 - NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) (6 page(s), 10/18/2013)
- ML14010A036 - Millstone, Unit 3 - Draft - Outlines (Folder 2). (20 page(s), 9/3/2013)
- ML14010A037 - Millstone, Unit 3 - Draft Written Exam (Folder 2). (127 page(s), 9/20/2013)
- ML14010A038 - Millstone, Unit 3 - Draft Operating Exam (Sections A, B, and C) (Folder 2). (367 page(s), 10/3/2013)
- ML14010A041 - Millstone Unit 3 - Final Outlines (Folder 3). (23 page(s), 12/6/2013)
- ML14010A042 - Millstone, Unit 3 - Final Written Examination with Answer Key (401-5 Format) (Folder 2). (133 page(s), 11/26/2013)
- ML14010A043 - Millstone, Unit 3 - Handouts to Applicants - Summary of References (Folder 3). (1 page(s), 11/26/2013)
- ML14010A045 - Millstone, Unit 3 - Final Operating Exam (Sections A, B, and C) (Folder 3). (369 page(s), 11/26/2013)
- ML14017A012 - ER 05000423/2013301; December 2-9, 2013; Millstone Power Station, Unit 3, Initial Operator Licensing Examination Report. (9 page(s), 1/16/2014)
- ML14017A248 - Millstone, Unit 3 - Final QA/Related Forms (Folder 1). (14 page(s), 12/30/2013)