Comanche Peak Nuclear Power Plant - Supplemental Response to Request for Additional Information 139 (4309) and 250 (6342) (Sections 2.4.2 and 3.3.2).
Accession Number: ML131540462
Date Released: Monday, June 17, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13154A394 - Comanche Peak Nuclear Power Plant - Supplemental Response to Request for Additional Information 139 (4309) and 250 (6342) (Sections 2.4.2 and 3.3.2). (17 page(s), 5/13/2013)
- ML13154A361 - Comanche Peak Units 3 and 4 (Final Safety Analysis Report), Part 2, Chapter 2 - RAI 139 S03 Figures 2.4.2-202 - SiteGrading and Drainage Plan. (26 page(s), 5/13/2013)
- ML13154A362 - Comanche Peak Units 3 and 4 (Final Safety Analysis Report), Part 2, Chapter 2 - RAI 139 S03 Text and Tables - 2.0-1R (Sheet 8 of 13) Key Site Parameters. (59 page(s), 5/13/2013)
- ML13154A363 - TXUT-001-FSAR 2.4.2-CALC-019, Rev 2, "Determination of the Local Intense Precipitation at the Comanche Peak Nuclear Power Plant Units 3 and 4. (HMR 51 & HMR 52)". (23 page(s), 4/30/2013)
- ML13154A369 - TXUT-001-FSAR-2.4.2-CALC-037, Rev 3, "Erosion Potential at Safety Related Structures Due to the Effects of Local Intense Precipitation - Comanche Peak Nuclear Power Plant Units 3 and 4." (1228 page(s), 4/17/2013)
- ML13154A370 - TXUT-001-FSAR-2.4.4-CALC-015, Rev 3, "Brazos River Dam Failures Analysis for Comanche Peak Nuclear Power Plant Units 3 & 4." Part 1 of 2. (59 page(s), 2/26/2013)
- ML13154A371 - TXUT-001-FSAR-2.4.4-CALC-015, Rev 3, "Brazos River Dam Failures Analysis for Comanche Peak Nuclear Power Plant Units 3 & 4." Part 2 of 2. (86 page(s), 2/26/2013)
- ML13154A364 - TXUT-001-FSAR 2.4.3-CALC-011, Rev 4, " Probable Maximum Precipitation Calculation for Comanche Peak Nuclear Power Plant Units 3 & 4 using HMR 51 & HMR 52." (671 page(s), 2/26/2013)
- ML13154A365 - TXUT-001-FSAR 2.4.3-CALC-012, Rev 5, "MITS004 - Probable Maximum Flood Calculation for Comanche Peak Nuclear Power Plant Units 3 and 4 (HES-HMS & HEC-RAS)." (3352 page(s), 2/26/2013)
- ML13154A366 - TXUT-001-FSAR 2.4.3-CALC-013, Rev 4, "Coincident Wind Wave Analysis for Comanche Peak Nuclear Power Plant Units 3 and 4." (23 page(s), 3/25/2013)