Home > NRC Library > ADAMS Public Documents
Watts Bar, Unit 2 - Submittal of Pre-op Test Instructions.
Accession Number: ML131480009
Date Released: Wednesday, June 5, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13148A010 - Watts Bar, Unit 2 - Submittal of Pre-op Test Instructions. (2 page(s), 5/20/2013)
- ML13148A011 - Watts Bar, Unit 2, Preoperational Test, 2-PTI-068-03, Rev. 0, "Pressurizer Heater and Spray Control." (208 page(s), 6/12/2012)
- ML13148A012 - Watts Bar, Unit 2, Preoperational Test, 2-PTI-068-07, Rev. 0, "Reactor Coolant Pump Motor Logic Test." (255 page(s), 12/19/2012)
- ML13148A013 - Watts Bar, Unit 2, Preoperational Test, 2-PTI-068-09, Rev. 0, "Reactor Vessel Head Vent System." (64 page(s), 12/13/2012)
- ML13148A014 - Watts Bar, Unit 2, Preoperational Test, 2-PTI-068-13, Rev. 1, "Shutdown from Outside the Main Control Room." (36 page(s), 4/4/2013)