Home > NRC Library > ADAMS Public Documents
Diablo Canyon Power Plant, Unit 2 - 5/9/2013 Phone Call Re: Safety Injection Pump 2-1 Issue Information (TAC No. MD7095).
Accession Number: ML13130A220
Date Released: Thursday, May 16, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13130A223 - Diablo Canyon Power Plant, Unit 2 - Email, Summary of 5/9/2013 Phone Call re: Safety Injection Pump 2-1 Issue Information (TAC No. MD7095). (2 page(s), 5/10/2013)
- ML13130A225 - Diablo Canyon Power Plant, Unit 2 - Technical Specification 3.5.2 RE: Safety Injection Pump 2-1 Issue Information (TAC NO. MD7095). (18 page(s), 5/10/2013)
- ML13130A228 - Diablo Canyon Power Plant, Unit 2 - Safety Injection Issue Summary RE: Pump 2-1 Issue Information (TAC NO. MD7095). (2 page(s), 5/10/2013)
- ML083460173 - Diablo Canyon Power Plant, Units 1 and 2, Issuance of Amendment No. 202 and 203 re: Increase the Completion Times for Required Actions Related to Technical Specifications 3.5.2, Re: the ECCS, and 3.6.6, Re: CS & CS (Tac MD7512 & MD7513). (27 page(s), 12/31/2008)