Home > NRC Library > ADAMS Public Documents
FOIA/PA-2013-0126 - Resp 1 - Final.
Accession Number: ML131060275
Date Released: Friday, April 19, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML103490330 - Oconee Nuclear Site, Units 1, 2, and 3, Oconee Response to Confirmatory Action Letter (CAL) 2-10-003. (7 page(s), 11/29/2010)
- ML13099A247 - Oconee Nuclear Site, Units 1, 2, and 3, Response to Confirmatory Action Letter (CAL) 2-10-003. (16 page(s), 4/29/2011)
- ML13039A084 - Generic Failure Rate Evaluation for Jocassee Dam. (15 page(s), 3/15/2010)
- ML101610083 - Oconee Nuclear Station, Units 1, 2, and 3 - External Flood Commitments. (5 page(s), 6/3/2010)
- ML13039A086 - Memorandum to Benjamin Beasley, RES from Lois James, NRR, Subject: Identification of a Generic External Flooding Issue Due to Potential Dam Failures. (9 page(s), 7/19/2010)
- ML13106A167 - FOIA/PA-2013-0126 - Resp 1 - Final. (3 page(s), 4/11/2013)