Home > NRC Library > ADAMS Public Documents
FOIA/PA-2013-0013 - Resp 1 - Partial.
Accession Number: ML130640243
Date Released: Thursday, March 7, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13064A211 - FOIA/PA-2013-0013 - Resp 1 - Partial. (1 page(s), 2/27/2013)
- ML12363A132 - Information Request Pursuant to 10 CFR 50.54(f) Related to External Flooding, Including Failure of the Jocassee Dam at Oconee Nuclear Station, Units 1, 2, and 3. (5 page(s), 8/15/2008)
- ML12363A133 - Oconee Nuclear Station Units 1, 2, and 3, Evaluation of Duke Energy Carolina September 26, 2008, Response to 10 CFR 50.554(f), Letter dated August 15, 2008, Related to External Flooding, Including Failure of the Jocassee Dam. (5 page(s), 4/30/2009)
- ML13039A084 - Generic Failure Rate Evaluation for Jocassee Dam. (15 page(s), 3/15/2010)
- ML13051A896 - Oconee Nuclear Site, Units 1, 2 and 3, Oconee Response to Confirmatory Action Letter 2-10-003. (5 page(s), 6/3/2010)
- ML12363A086 - CAL 2-10-003 - Confirmatory Action Letter- Oconee Nuclear Station, Units 1,2 and 3 Commitments to Address External Flooding Concerns (TAC NOS. ME3065, ME3066 and ME3067 (7 page(s), 6/22/2010)
- ML13039A086 - Memorandum to Benjamin Beasley, RES from Lois James, NRR, Subject: Identification of a Generic External Flooding Issue Due to Potential Dam Failures. (9 page(s), 7/19/2010)
- ML103490330 - Oconee Nuclear Site, Units 1, 2, and 3, Oconee Response to Confirmatory Action Letter (CAL) 2-10-003. (7 page(s), 11/29/2010)