Home > NRC Library > ADAMS Public Documents
FOIA/PA-2013-0045 - Resp 1 - Final.
Accession Number: ML130310836
Date Released: Thursday, February 7, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13031A639 - FOIA/PA-2013-0045 - Resp 1 - Final. (5 page(s), 1/30/2013)
- ML13031A630 - From James Krafty To Josephine Ambrosini: Millstone 2 Service Water Temp. (1 page(s), 8/9/2012)
- ML13031A631 - From Josephine Ambrosini To Ron Bellamy: Re Update Millstone U2 Ultimate Heat Sink. (2 page(s), 8/10/2012)
- ML13031A632 - From Josephine Ambrosini To Ron Bellamy: Re Millstone U2 Ultimate Heat Sink. (2 page(s), 8/12/2012)
- ML13031A633 - Email from J. Ambrosini, RI to R. Bellamy, RI et al., on Millstone Unit UHS: August 12 update. (1 page(s), 8/12/2012)
- ML13031A634 - Email from J. Ambrosini, RI to J. Ambrosini, RI et al., RE: Millstone Unit 2 UHS: August 12 Updates. (2 page(s), 8/12/2012)
- ML13031A635 - Status Report on Unidentified Leakage for Vermont Yankee, Pilgrim, and Millstone, Units 2 and 3. (1 page(s), 8/12/2012)
- ML13031A636 - From Ron Bellamy To Jim Clifford: Millstone Unit 2 Ts Required Shutdown. (1 page(s), 8/12/2012)
- ML13031A637 - 8:30 Am Daily Reactor Oversight Coordination Meeting. (3 page(s), 8/13/2012)
- ML13031A638 - Email from R. Bellamy to T. Setzer: Millstone 3-Emergency TS Amendment. (1 page(s), 8/14/2012)
- ML13032A124 - Email from J. Kim, NRR to D. Merzke, EDO FW: reply - Millstone Emergency TS Amendments. (1 page(s), 8/15/2012)
- ML13032A126 - Email from J. Ambrosini to James Kim: Millstone UHS Current Status. (2 page(s), 8/16/2012)
- ML13032A127 - From Josephine Ambrosini to Tom Setzer: Uhs Basis Info. (3 page(s), 8/16/2012)
- ML13032A128 - Email from J. Ambrosini, RI to J. Kim, NRR et al., RE: Millstone UHS Current Status (8/16/12). (2 page(s), 8/16/2012)
- ML13032A129 - 8:30 Am Daily Reactor Oversight Coordination Meeting (3 page(s), 8/16/2012)
- ML13032A130 - 8:30 Am Daily Reactor Oversight Coordination Meeting. (3 page(s), 8/20/2012)
- ML13032A131 - 8:30 Am Daily Reactor Oversight Coordination Meeting. (3 page(s), 8/21/2012)
- ML13032A132 - 8:30 Am Daily Reactor Oversight Coordination Meeting. (3 page(s), 8/23/2012)
- ML12222A350 - Millstone Power Station, unit 2 - Issuance of Emergency Amendment Re: Removal of License Condition, Proposed Technical Specifications Bases Change and FASR Change for Ultimate Heat Sink Temperature Measurement (TAC No. ME9108). (14 page(s), 8/10/2012)
- ML13032A133 - Email from Mark King: IOEB. Clearinghouse Screening Summary (3 pages) (Portions Marked Outside of Scope). (3 page(s), 8/13/2012)