Home > NRC Library > ADAMS Public Documents
South Texas Project, Units 1 and 2 - Evacuation Time Estimate Study.
Accession Number: ML123610077
Date Released: Wednesday, January 30, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12361A069 - South Texas Project, Units 1 and 2 - Evacuation Time Estimate Study. (2 page(s), 12/17/2012)
- ML12361A070 - KLD TR-491, Final Report, Rev. 1, "South Texas Project Electric Generating Station, Development of Evacuation Time Estimates," Cover through Page 12-2. (166 page(s), 12/17/2012)
- ML12361A071 - KLD TR-491, Final Report, Rev. 1, "South Texas Project Electric Generating Station, Development of Evacuation Time Estimates," Appendix A - Glossary of Traffic Engineering Terms through Appendix H, Evaluation Regions. (110 page(s), 12/17/2012)
- ML12361A073 - KLD TR-491, Final Report, Rev. 1, "South Texas Project Electric Generating Station, Development of Evacuation Time Estimates," Appendix J - Representatives Inputs to the Outputs from the DYNEV II System through End. (106 page(s), 12/17/2012)